NRC Logo

Home > NRC Library > ADAMS Public Documents

Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Exemption from the Requirements of 10 CFR 50.71(e)(4), Final Safety Analysis Report Update Schedule (EPID L-2023-LLE-0023)

Accession Number: ML24031A635

Date Released: Thursday, September 19, 2024

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer