Home > NRC Library > ADAMS Public Documents
Seabrook Station Revision 22 to Updated Final Safety Analysis Report
Accession Number: ML23317A044
Date Released: Thursday, May 23, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23317A125 - Seabrook Station Submittal of Revision 22 to Updated Final Safety Analysis Report, Revision 19 to Fire Protection Safe Shutdown Capability, Revision 20 to Appendix A and Rev. 168 to TRM. (11/3/2023)
- ML23317A133 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, List of Effective Pages and Chapter 1, Introduction and General Description of Plant (11/3/2023)
- ML23317A148 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Figures 2.3-1 through 2.3-11 (11/3/2023)
- ML23317A141 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2A, Onsite Meteorological Data Summaries November 1971 - March 1973 (11/3/2023)
- ML23317A162 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2B, Onsite Meteorological Data Summaries April 1979 - March 1980 (11/3/2023)
- ML23317A149 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2C, Geologic Investigations of the Scotland Road Fault (Clinton - Newbury Fault), Newbury, Massachusetts, and Portsmouth Fault Investigations (11/3/2023)
- ML23317A160 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2D, Geologic Bedrock Logs of Boring in the Site Area (11/3/2023)
- ML23317A143 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2E, Historical Earthquakes in the Site Vicinity (11/3/2023)
- ML23317A138 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2F, Geotechnical Report - Reactor Borings - July 1974 (11/3/2023)
- ML23317A142 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2G, Static Dynamic Rock Properties (11/3/2023)
- ML23317A150 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2J, Sample Descriptions For Borings Made In November-December 1972 (11/3/2023)
- ML23317A128 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 2, Appendix 2L, Geologic Investigation Of Soils And The Bedrock Surface At Unit 2 Containment Site (11/3/2023)
- ML23317A156 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment And Systems (11/3/2023)
- ML23317A137 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1 (11/3/2023)
- ML23317A130 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 2 (11/3/2023)
- ML23317A171 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 3 (11/3/2023)
- ML23317A166 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3A - 3C (11/3/2023)
- ML23317A164 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Appendices 3D - 3F (11/3/2023)
- ML23317A140 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3G, Part 1 (11/3/2023)
- ML23317A170 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Appendix Appendix G, Part 2 and Appendix H (11/3/2023)
- ML23317A129 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 3, Appendix 3I, Report On Analysis Of High Energy Line Breaks Outside Containment (11/3/2023)
- ML23317A159 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 4, Reactor (11/3/2023)
- ML23317A146 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System And Connected Systems (11/3/2023)
- ML23317A169 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (11/3/2023)
- ML23317A131 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (11/3/2023)
- ML23317A135 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (11/3/2023)
- ML23317A136 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (11/3/2023)
- ML23317A165 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (11/3/2023)
- ML23317A139 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (11/3/2023)
- ML23317A155 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (11/3/2023)
- ML23317A147 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (11/3/2023)
- ML23317A132 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (11/3/2023)
- ML23317A161 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Chapter 17, Quality Assurance (11/3/2023)
- ML23317A134 - Seabrook Station Revision 22 to Updated Final Safety Analysis Report, Chapter 18, Aging Management Programs (11/3/2023)
- ML23317A168 - Seabrook Station Revision 19 to Fire Protection Safe Shutdown Capability (EC 297539, Section 3.2 and EC 296106 Section 3.2 and Section 3.4), 10CFR50, Appendix R (11/3/2023)
- ML23317A145 - Seabrook Station Revision 168 to Technical Requirements Manual (11/3/2023)