Home > NRC Library > ADAMS Public Documents
Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 (EPID No. L-2023-LRM-0097)
Accession Number: ML23313A094
Date Released: Monday, November 27, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23313A095 - Summary of November 7, 2023, Observation Pre-Submittal Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a Proposed License Amendment Request for Vogtle Electric Generating Plant, Units 1 and 2 (EPID No. L-2023-LRM-0097) (7 page(s), 11/16/2023)
- ML23297A195 - 11/07/2023 Vogtle, Units 1 and 2 - Pre-Submittal Meeting for Proposed License Amendment Request (LAR) to Reduce Ultimate Heat Sink (UHS) and Nuclear Service Cooling Water (NSCW) Fan Mission Times (3 page(s), 10/24/2023)
- ML23304A268 - Vogtle Electric Generating Plant, Units 1 and 2 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time Pre Submittal Meeting on November 7, 2023 (EPID L-2023-LRM-0097) (29 page(s), 11/7/2023)
- ML23311A245 - Vogtle, Units 1 & 2 Pre-Submittal Meeting on November 7, 2023 - License Amendment Request to Revise the Ultimate Heat Sink Mission Time (Slides) (11/7/2023)