Susquehanna Steam Electric Station - Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report
Accession Number: ML23291A105
Date Released: Tuesday, January 2, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23291A113 - Susquehanna Steam Electric Station - Submittal of Revision 71 to Updated Final Safety Analysis Report and Revision 25 to Fire Protection Review Report (28 page(s), 10/12/2023)
- ML23291A343 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, List Of Effective Pages (10/12/2023)
- ML23291A344 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Table of Contents (10/12/2023)
- ML23291A342 - Susquehanna Steam Electric Station Revision 25 to Fire Protection Review Report, List of Effective Pages (649 page(s), 10/12/2023)
- ML23291A411 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.1, Introduction (10/12/2023)
- ML23291A387 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.2, General Plant Description (82 page(s), 10/12/2023)
- ML23291A410 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.3, Comparison Tables (10/12/2023)
- ML23291A400 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.4, Identification Of Agents And Contractors (7 page(s), 10/12/2023)
- ML23291A383 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.5, Requirements for Further Technical Information (3 page(s), 10/12/2023)
- ML23291A373 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.6, Material Incorporated By Reference (10/12/2023)
- ML23291A403 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.7, Electrical, Instrumentation And Control Drawings (90 page(s), 10/12/2023)
- ML23291A378 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Section 1.8, Symbols and Terms used In Engineering And Text (62 page(s), 10/12/2023)
- ML23291A393 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 2, Section 2.1, Geography and Demography (30 page(s), 10/12/2023)
- ML23291A390 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 2, Section 2.2, Nearby Industrial, Transportation, and Military Facilities (19 page(s), 10/12/2023)
- ML23291A381 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 2, Section 2.3, Meteorology (199 page(s), 10/12/2023)
- ML23291A377 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 2, Section 2.4, Hydrologic Engineering (172 page(s), 10/12/2023)
- ML23291A414 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 2, Section 2.5, Geology, Seismology And Geotechnical Engineering (278 page(s), 10/12/2023)
- ML23291A413 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.1, Conformance With NRC General Design Criteria (10/12/2023)
- ML23291A405 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.2, Classification Of Structures, Components And Systems (59 page(s), 10/12/2023)
- ML23291A380 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.3, Wind and Tornado Loadings (9 page(s), 10/12/2023)
- ML23291A382 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.4, Water Level (Flood) Design (10/12/2023)
- ML23291A395 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.5, Missile Protection (29 page(s), 10/12/2023)
- ML23291A406 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.6, Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping (144 page(s), 10/12/2023)
- ML23291A402 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.7a, Design Design (148 page(s), 10/12/2023)
- ML23291A384 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Category I Structures (320 page(s), 10/12/2023)
- ML23291A389 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.9, Mechanical Systems And Components (207 page(s), 10/12/2023)
- ML23291A379 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.10, Seismic Qualification Of Seismic Category I Instrumentation And Electrical Equipment (70 page(s), 10/12/2023)
- ML23291A408 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.11, Environmental Design Of Mechanical And Electrical Equipment (25 page(s), 10/12/2023)
- ML23291A392 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.12, Separation Criteria For Safety Related Mechanical and Electrical Power Equipment (16 page(s), 10/12/2023)
- ML23291A412 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.13, Compliance with NRC Regulatory Guides (58 page(s), 10/12/2023)
- ML23291A388 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 3, Section 3.14, License Renewal Programs, TLAA, and Commitments (52 page(s), 10/12/2023)
- ML23291A394 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.1, Summary Description (20 page(s), 10/12/2023)
- ML23291A407 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.2, Fuel System Design (32 page(s), 10/12/2023)
- ML23291A401 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.3, Nuclear Design (64 page(s), 10/12/2023)
- ML23291A376 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.4, Thermal And Hydraulic Design (46 page(s), 10/12/2023)
- ML23291A386 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.5, Reactor Materials (10/12/2023)
- ML23291A396 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 4, Section 4.6, Fictional Design Of Reactivity Control Systems (38 page(s), 10/12/2023)
- ML23291A371 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 5, Section 5.1, Summary Description (11 page(s), 10/12/2023)
- ML23291A375 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 5, Section 5.2, Integrity of Reactor Coolant Pressure Boundary (71 page(s), 10/12/2023)
- ML23291A369 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 5, Section 5.3, Reactor Vessel (28 page(s), 10/12/2023)
- ML23291A391 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 5, Section 5.4, Component and Subsystem Design (68 page(s), 10/12/2023)
- ML23291A385 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.0, Engineered Safety Features (2 page(s), 10/12/2023)
- ML23291A374 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.1, Engineered Safety Feature Materials (17 page(s), 10/12/2023)
- ML23291A409 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.2, Containment Systems (228 page(s), 10/12/2023)
- ML23291A370 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.3, Emergency Core Cooling Systems (99 page(s), 10/12/2023)
- ML23291A398 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.4, Habitability Systems (15 page(s), 10/12/2023)
- ML23291A397 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.5, Fission Product Removal and Control Systems (33 page(s), 10/12/2023)
- ML23291A372 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.6, In-Service Inspection of Class 2 and 3 Components (10/12/2023)
- ML23291A415 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Section 6.7, Main Steam Isolation Valve Leakage Isolated Condenser Treatment Method (7 page(s), 10/12/2023)
- ML23291A404 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6A, Subcompartment Differential Pressure Considerations (45 page(s), 10/12/2023)
- ML23291A399 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 6, Appendix 6B, Compartment Differential Pressure Analysis Description (11 page(s), 10/12/2023)
- ML23291A416 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.1, Introduction (85 page(s), 10/12/2023)
- ML23291A418 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.2, Reactor Trip System - (Reactor Protection System) - Instrumentation and Controls (85 page(s), 10/12/2023)
- ML23291A420 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.3, Engineered Safety Feature Systems (212 page(s), 10/12/2023)
- ML23291A417 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.4, Systems Required for Safe Shutdown (53 page(s), 10/12/2023)
- ML23291A419 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.5, Safety-Related Display Instrumentation (10/12/2023)
- ML23291A424 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.6, All Other Instrumentation Systems Required for Safety (86 page(s), 10/24/2023)
- ML23291A422 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 7, Section 7.7, Controls Systems not Required for Safety (100 page(s), 10/12/2023)
- ML23291A421 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 8, Section 8.1, Introduction (10/12/2023)
- ML23291A425 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 8, Section 8.2, Offsite Power System (10/12/2023)
- ML23291A423 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 8, Section 8.3, On-Site Power Systems (174 page(s), 10/12/2023)
- ML23292A138 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Section 9.1, Fuel Storage and Handling (104 page(s), 10/12/2023)
- ML23292A155 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Section 9.2, Water Systems (144 page(s), 10/12/2023)
- ML23292A168 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Section 9.3, Process Auxiliaries (72 page(s), 10/12/2023)
- ML23292A136 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Section 9.4, Air Conditioning, Heating, Cooling and Ventilation Systems (133 page(s), 10/12/2023)
- ML23292A167 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Section 9.5, Other Auxiliary Systems (86 page(s), 10/12/2023)
- ML23292A173 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9A, Analysis For Non-Seismic Spent Fuel Pool Cooling Systems (6 page(s), 10/12/2023)
- ML23292A148 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 9, Appendix 9B, Compliance with NRC Branch Technical Position ASB 9-1, Susquehanna Steam Electric Station Unit 1 Reactor Building Crane (9 page(s), 10/12/2023)
- ML23292A164 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 10, Section 10.1, Summary Description (10/12/2023)
- ML23292A146 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 10, Section 10.2, Turbine-Generator (18 page(s), 10/12/2023)
- ML23292A174 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 10, Section 10.3, Main Steam Supply System (10/12/2023)
- ML23292A139 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 10, Section 10.4, Other Features of The Steam And Power Conversion System (66 page(s), 10/12/2023)
- ML23292A142 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Section 11.1, Source Terms (21 page(s), 10/12/2023)
- ML23292A171 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.2, Liquid Waste Management Systems (67 page(s), 10/12/2023)
- ML23292A156 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.3, Gaseous Waste Management Systems (48 page(s), 10/12/2023)
- ML23292A165 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.4, Solid Waste Management System (41 page(s), 10/12/2023)
- ML23292A149 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.5, Process and Effluent Radiological Monitoring And Sampling Systems (22 page(s), 10/12/2023)
- ML23292A166 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.6, Low Level Radwaste Holding Facility (LLRWHF) (34 page(s), 10/12/2023)
- ML23292A172 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 11, Section 11.7, Independent "Dry Fuel Storage" (10/12/2023)
- ML23292A161 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 12, Section 12.1, Ensuring That Occupational Radiation Exposures Are as Low As Reasonably Achievable (ALARA) (10/12/2023)
- ML23292A145 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 12, Section 12.2, Radiation Sources (77 page(s), 10/12/2023)
- ML23292A134 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 12, Section 12.3, Radiation Protection Design Features (60 page(s), 10/12/2023)
- ML23292A135 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 12, Section 12.4, Dose Assessment (10/12/2023)
- ML23292A150 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 12, Section 12.5, Radiation Protection Program (10/12/2023)
- ML23292A152 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.1, Organizational Structure (10/12/2023)
- ML23292A132 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Training Program (10/12/2023)
- ML23292A130 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Emergency Planning (1 page(s), 10/12/2023)
- ML23292A133 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Review and Audit (10/12/2023)
- ML23292A137 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Plant Procedures (10/12/2023)
- ML23292A153 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Industrial Security (1 page(s), 10/12/2023)
- ML23292A154 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Specific Information to be Included in Preliminary Safety Analysis Reports (1 page(s), 10/12/2023)
- ML23292A129 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Specific Information to be Included in Final Safety Analysis Report (213 page(s), 10/12/2023)
- ML23292A158 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Power Uprate Test Program (21 page(s), 10/12/2023)
- ML23292A162 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (10/12/2023)
- ML23292A143 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.1, Decrease in Reactor Coolant Temperature (19 page(s), 10/12/2023)
- ML23292A144 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.2, Increase in Reactor Pressure (10/12/2023)
- ML23292A169 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.3, Decrease in Reactor Coolant System Flow Rate (10/12/2023)
- ML23292A151 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.4, Reactivity And Power Distribution Anomalies (38 page(s), 10/12/2023)
- ML23292A147 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.5, Increase in Reactor Coolant Inventory (10/12/2023)
- ML23292A141 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.6, Decrease In Reactor Coolant Inventory (52 page(s), 10/12/2023)
- ML23292A140 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.7, Radioactive Release From Subsystems And Components (42 page(s), 10/12/2023)
- ML23292A131 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.8, Anticipated Transients Without Scram (10/12/2023)
- ML23292A163 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Section 15.9, Station Blackout (12 page(s), 10/12/2023)
- ML23292A157 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15A, Nuclear Safety Operational Analysis (NSOA) (130 page(s), 10/12/2023)
- ML23292A175 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15B, Accident Dose Model Descriptions (11 page(s), 10/12/2023)
- ML23292A159 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15C, Susquehanna Steam Electric Station Unit 1 Final Safety Analysis Report-Cycle Specific Data (33 page(s), 10/12/2023)
- ML23292A170 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15D, Susquehanna Steam Electric Station Unit 2 Final Safety Analysis Report Cycle Specific Data (33 page(s), 10/12/2023)
- ML23292A160 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 15, Appendix 15E, Initial Core For SSES Units 1 And 2, Non-Limiting Events (51 page(s), 10/12/2023)
- ML23292A226 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 16, Section 16.1, Preliminary Technical Specifications (1 page(s), 10/12/2023)
- ML23292A201 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 16, Section 16.2, Proposed Final Technical Specifications (1 page(s), 10/12/2023)
- ML23292A187 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 16, Section 16.3, Technical Requirements Manuals (1 page(s), 10/12/2023)
- ML23292A225 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 17, Section 17.1, "This Section N/A to FSAR" (1 page(s), 10/12/2023)
- ML23292A198 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 17, Section 17.2, Quality Assurance During The Operations Phase (43 page(s), 10/12/2023)
- ML23292A200 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 18, Responses To TMI Related Requirements (1 page(s), 10/12/2023)
- ML23292A186 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 18, Section 18.1, Response to Requirements in NUREG-0737 (118 page(s), 10/12/2023)
- ML23292A189 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 18, Section 18.2, Response To Requirements In NUREG 0694 (15 page(s), 10/12/2023)
- ML23292A227 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Figures referenced in the FSAR Are Withheld Under 10 CFR 2.390 (10/12/2023)
- ML23292A214 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 005.1 Through 005.6 (10/12/2023)
- ML23292A218 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Chapter 1, Questions 010.1 Through 010.26 (28 page(s), 10/12/2023)
- ML23292A205 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 021.01 Through 021.88 (126 page(s), 10/12/2023)
- ML23292A224 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 032.1 Through 032.103 (173 page(s), 10/12/2023)
- ML23292A216 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 040.1 Through 40.99 (121 page(s), 10/12/2023)
- ML23292A191 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 110.1 through 110.57 (137 page(s), 10/12/2023)
- ML23292A202 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Response 112.1 through 112.10 (10/12/2023)
- ML23292A229 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 121.1 Through 121.21 (10/12/2023)
- ML23292A196 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 123.1 Through 123.9 (10/12/2023)
- ML23292A204 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 130.1 Through 130.28 (10/12/2023)
- ML23292A203 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 211.1 Through 211.296 (405 page(s), 10/12/2023)
- ML23292A190 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 221.1 Through 221.15 (10/12/2023)
- ML23292A212 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 222.1 through 222.2 (10/12/2023)
- ML23292A207 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 230.1 Through 230.8 (10/12/2023)
- ML23292A219 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 231.1 Through 231.5 (10/12/2023)
- ML23292A192 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 232.1 through 232.4 (10/12/2023)
- ML23292A221 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Response 260.1 (10/12/2023)
- ML23292A195 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 281.1 through 281.29 (10/12/2023)
- ML23292A193 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 312.1 through 312.24 (10/12/2023)
- ML23292A210 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 313.1 Through 313.9 (10/12/2023)
- ML23292A222 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions 321.1 Through 321.7 (10/12/2023)
- ML23292A223 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 331.1 Through 331.19 (10/12/2023)
- ML23292A194 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Response 361.1 through 361.5-1 (10/12/2023)
- ML23292A213 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 362.1 Through 362.25 (10/12/2023)
- ML23292A199 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 371.1 through 371.30 (10/12/2023)
- ML23292A206 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 372.1 through 372.28 (10/12/2023)
- ML23292A211 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 400.1 (10/12/2023)
- ML23292A217 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 410.1 through 410.13 (10/12/2023)
- ML23292A209 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 421.1 through 421.42 (10/12/2023)
- ML23292A208 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 422.1 through 422.4 (10/12/2023)
- ML23292A215 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 423.1 through 423.58 (10/12/2023)
- ML23292A228 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Question and Response 440.1 (10/12/2023)
- ML23292A220 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 441.1 through 441.15 (10/12/2023)
- ML23292A185 - Susquehanna Steam Electric Station Revision 71 to Updated Final Safety Analysis Report, Questions and Responses 442.1 through 442.3 (10/12/2023)