Home > NRC Library > ADAMS Public Documents
VEGP Units 3 and 4 LAR 22-002, Technical Specification 3.8.3, "Inverters Operating, Completion Time Extension" Amendments 197/193 (EPID: L-2023-LLA-0002)
Accession Number: ML23243A956
Date Released: Thursday, December 21, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23353A170 - Vogtle, Units 3 and 4, LAR-22-002, TS 3.8.3 Inverters Operating Completion Time Extension Letter (12/19/2023)
- ML23243A968 - VEGP Unit 3 Amendment No. 197 - Enclosure 1 (2 page(s), 12/19/2023)
- ML23243B054 - VEGP Unit 4 Amendment No. 193 - Enclosure 2 (2 page(s), 12/19/2023)
- ML23243A980 - VEGP Unit 3 Amendment Attachment (2 page(s), 12/19/2023)
- ML23243B057 - VEGP Unit 4 Amendment Attachment (2 page(s), 12/19/2023)
- ML23243B049 - VEGP Units 3 and 4, Safety Evaluation, LAR-22-002, TS 3.8.3 Inverters Operating, Completion Time Extension - Enclosure 3 (17 page(s), 12/19/2023)