Home > NRC Library > ADAMS Public Documents
Wolf Creek Generating Station, Redacted Version of Revision 36 to Updated Safety Analysis Report
Accession Number: ML23135A163
Date Released: Thursday, August 31, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML23135A117 - Wolf Creek Generating Station, Redacted Version of Revision 36 to Updated Safety Analysis Report (5/8/2023)
- ML23135A164 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Cover Sheet (5/8/2023)
- ML23135A165 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant (5/8/2023)
- ML23135A166 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 2, Site Characteristics (5/8/2023)
- ML23135A167 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Figures (5/8/2023)
- ML23135A168 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (5/8/2023)
- ML23135A169 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 4, Reactor (5/8/2023)
- ML23135A170 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (5/8/2023)
- ML23135A171 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 6, Engineered Safety Features (5/8/2023)
- ML23135A173 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 7, Instrumentation and Controls (5/8/2023)
- ML23135A174 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 8, Electric Power (5/8/2023)
- ML23135A175 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 9, Auxiliary Systems (5/8/2023)
- ML23135A176 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 10, Steam and Power Conversion System (5/8/2023)
- ML23135A177 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 11, Radioactive Waste Management (5/8/2023)
- ML23135A178 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 12, Radiation Protection (5/8/2023)
- ML23135A179 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 13, Conduct of Operations (5/8/2023)
- ML23135A180 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 14, Initial Test Program (5/8/2023)
- ML23135A181 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 15, Accident Analysis (5/8/2023)
- ML23135A182 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 16, Relocated Technical Specifications (5/8/2023)
- ML23135A183 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 17, Quality Assurance (5/8/2023)
- ML23135A184 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 1 of 2 (5/8/2023)
- ML23135A185 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 18, Response to NUREG-0737 Clarification of TMI Action Plan Requirements - Part 2 of 2 (5/8/2023)
- ML23135A186 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, List of Effective Pages (LOEP) (5/8/2023)
- ML23135A126 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 1, Figures - Redacted (47 page(s), 5/8/2023)
- ML23135A125 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 2, Figures (11 page(s), 5/8/2023)
- ML23135A124 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 5, Figures (5/8/2023)
- ML23135A118 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 6, Figures (10 page(s), 5/8/2023)
- ML23135A121 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 7, Figures (21 page(s), 5/8/2023)
- ML23135A119 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 8, Figures (11 page(s), 5/8/2023)
- ML23135A120 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 9, Figures, Redacted (5/8/2023)
- ML23135A122 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 10, Figures (5/8/2023)
- ML23135A123 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 11, Figures (11 page(s), 5/8/2023)
- ML23135A127 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 12, Figures, Redacted (7 page(s), 5/8/2023)
- ML23135A128 - Wolf Creek Generating Station, Revision 36 to Updated Safety Analysis Report, Chapter 18, Figures (1 page(s), 5/8/2023)
- ML23135A187 - Wolf Creek Generating Station, Report M-6630-00017A, Revision W08, Fire Protection Evaluation For Unique or Unbounded Fire Barrier Configurations (5/8/2023)
- ML23135A190 - Wolf Creek Generating Station, Report, M-6630-00017A, Revision W08, Fire Protection Evaluation For Penetrant Size Exceeding Typical Detail FB-1 Limitation (5/8/2023)
- ML23135A188 - Wolf Creek Generating Station, Report, M-6630-00017A, Revision W08, Fire Protection Evaluation For Unique or Unbounded Fire Wrap Configurations, Attachments C to G3C (5/8/2023)
- ML23135A189 - Wolf Creek Generating Station, Report, M-6630-00017A, Revision W08, Structural Steel Fireproofing Data (5/8/2023)
- ML23135A205 - Wolf Creek Generating Station, Quality Program Manual, WCQPM, Rev 13 (98 page(s), 5/8/2023)
- ML23135A196 - Wolf Creek Generating Station, Report, E-1F9900 Rev 10, Redacted, Post-Fire Shutdown Operator Manual Actions (116 page(s), 5/8/2023)
- ML23135A199 - Wolf Creek Generating Station, Fire Hazard Analysis Report, E-1F9905 Rev 11, Post-Fire Shutdown Operator Manual Actions (281 page(s), 5/8/2023)
- ML23135A192 - Wolf Creek Generating Station, Report, E-1F9910 Rev 17, Post-Fire Shutdown Operator Manual Actions (5/8/2023)
- ML23135A204 - Wolf Creek Generating Station, E-1F9915, Rev. 16, Design Basis Document for OFN RP-017, Control Room Evacuation (253 page(s), 11/9/2022)
- ML23135A203 - Wolf Creek Generating Station, Calculation XX-E-013, Rev. 4, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A200 - Wolf Creek Generating Station, Calculation XX-E-013, Rev. 4, CN002, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A194 - Wolf Creek Generating Station, Calculation XX-E-013 Rev. 4, CN003, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A206 - Wolf Creek Generating Station, Calculation XX-E-013, Rev 4, CN004, Post-Fire Safe Shutdown (PFSSD) Analysis (24 page(s), 5/8/2023)
- ML23135A208 - Wolf Creek Generating Station, Calculation XX-E-013, Rev 4, CN005, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A195 - Wolf Creek Generating Station, Calculation XX-E-013, Rev 4, CN006, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A202 - Wolf Creek Generating Station, Calculation XX-E-013, Rev 4, CN007, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A198 - Wolf Creek Generating Station, Calculation XX-E-013, Rev. 4, CN008, Post-Fire Safe Shutdown (PFSSD) Analysis (27 page(s), 5/8/2023)
- ML23135A197 - Wolf Creek Generating Station, Calculation XX-E-013, Rev 4, CN009, Post-Fire Safe Shutdown (PFSSD) Analysis (5/8/2023)
- ML23135A207 - Wolf Creek Generating Station, EQSD-I, Rev 17, Equipment Qualification Design Basis Document (4/6/2022)
- ML23135A201 - Wolf Creek Generating Station, EQSD-I, Rev 18, Equipment Qualification Design Basis Document (358 page(s), 12/6/2022)
- ML23135A193 - Wolf Creek Generating Station, EQSD-II, Rev 34, Equipment Qualification Summary Document (119 page(s), 9/1/2022)