NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application
Accession Number: ML22339A066
Date Released: Tuesday, January 31, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22333B005 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application - Part 1, "General and Financial Information," Revision 0 (11/29/2022)
- ML22365A002 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application Part 2 – Final Safety Analysis Report, Chapter 1, "Introduction and General Description of the Plant," Revision 0 (12/31/2022)
- ML22337A001 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 2, "Site Characteristics and Site Parameters," Revision 0 (12/3/2022)
- ML23001A016 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 3, "Design of Structures, Systems, Components and Equipment," Revision 0 (12/31/2022)
- ML22362A079 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 4, "Reactor," Revision 0 (12/28/2022)
- ML22365A021 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 6, "Engineered Safety Features," Revision 0 (12/31/2022)
- ML22365A024 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 7, "Instrumentation and Controls," Revision 0 (12/31/2022)
- ML22333A763 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 – Final Safety Analysis Report, Chapter 8, "Electric Power," Revision 0 (11/29/2022)
- ML22364A281 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 9, "Auxiliary Systems," Revision 0 (12/30/2022)
- ML22349A671 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 – Final Safety Analysis Report, Chapter 10, "Steam and Power Conversion System," Revision 0 (12/15/2022)
- ML22364A276 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 11, "Radioactive Waste Management," Revision 0 (12/30/2022)
- ML22362A116 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 12, "Radiation Protection," Revision 0 (12/28/2022)
- ML22337A003 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 13, "Conduct of Operations," Revision 0 (12/3/2022)
- ML22362A070 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 14, "Initial Test Program and Inspections, Tests, Analyses, and Acceptance Criteria," Revision 0 (12/28/2022)
- ML22365A006 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 15, "Transient and Accident Analyses," Revision 0 (12/31/2022)
- ML22363A194 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 16, “Technical Specifications,” Revision 0 (12/29/2022)
- ML22362A027 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 17, "Quality Assurance and Reliability Assurance," Revision 0 (30 page(s), 12/28/2022)
- ML22365A013 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 18, "Human Factors Engineering," Revision 0 (12/31/2022)
- ML22365A010 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 – Final Safety Analysis Report, Chapter 19, "Probabilistic Risk Assessment and Severe Accident Evaluation," Revision 0 (12/31/2022)
- ML23001A000 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application - Part 4, "US460 Generic Technical Specifications," Volumes 1 and 2, Revision 0 (12/31/2022)
- ML22365A018 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application - Part 7, "Exemptions," Revision 0 (90 page(s), 12/31/2022)
- ML22365A019 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application - Part 8, "License Conditions; Inspections, Tests, Analyses, and Acceptance Criteria," Revision 0 (12/31/2022)
- ML22365A004 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application - Part 9, "Withheld Information," Revision 0 (12/31/2022)
- ML22337A002 - NuScale Power, LLC, Submittal of the NuScale Standard Design Approval Application - Part 10, "Quality Assurance Program Description," Revision 0 (12/3/2022)
- ML22365A016 - NuScale Power, LLC Submittal of the NuScale Standard Design Approval Application Part 2 - Final Safety Analysis Report, Chapter 5, "Reactor Coolant System and Connecting Systems," Revision 0 (12/31/2022)