Home > NRC Library > ADAMS Public Documents
Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) through EIE on November 9, 2022
Accession Number: ML22325A160
Date Released: Wednesday, June 28, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22325A158 - Replacement Files for Submittal of Revision 24 to the Fermi 2 Updated Final Safety Analysis Report (UFSAR) through EIE on November 9, 2022 (11/17/2022)
- ML22325A147 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, List of Effective Sections, Tables, and Figures (11/17/2022)
- ML22325A129 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Main Page (11/17/2022)
- ML22325A145 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (11/17/2022)
- ML22325A142 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (11/17/2022)
- ML22325A139 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (11/17/2022)
- ML22325A131 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 4, Reactor (11/17/2022)
- ML22325A138 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (11/17/2022)
- ML22325A130 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (11/17/2022)
- ML22325A135 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (11/17/2022)
- ML22325A125 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (11/17/2022)
- ML22325A134 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (11/17/2022)
- ML22325A133 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (11/17/2022)
- ML22325A144 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (11/17/2022)
- ML22325A126 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (11/17/2022)
- ML22325A143 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (11/17/2022)
- ML22325A127 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 14, Initial Tests and Operation (11/17/2022)
- ML22325A132 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (11/17/2022)
- ML22325A146 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (11/17/2022)
- ML22325A124 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Appendix A, Applicable Regulatory Guides (11/17/2022)
- ML22325A136 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Appendix B, Aging Management Programs and Activities (11/17/2022)
- ML22325A154 - Fermi 2 Revision 24 to Updated Final Safety Analysis Report, Figures (For Public Use) (11/17/2022)