NRC Logo

Home > NRC Library > ADAMS Public Documents

Kairos Power, LLC, Notification of the Issuance of the Draft Environmental Impact Statement for the Construction Permit for Kairos Hermes Non-Power Test Reactor in Oak Ridge, TN

Accession Number: ML22243A251

Date Released: Thursday, September 29, 2022

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer