Home > NRC Library > ADAMS Public Documents
Vogtle, Units 3 and 4, Submittal of Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual
Accession Number: ML22179A121
Date Released: Tuesday, July 5, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22167A119 - Vogtle, Units 3 and 4, Submittal of Updated Final Safety Analysis Report, Tier 1, Technical Requirements Manual and Technical Specifications Bases Annual Submittal. (12 page(s), 6/15/2022)
- ML22179A145 - Vogtle, Units 3 and 4, Rev. 11 to Updated Final Safety Analysis Report. (6462 page(s), 6/15/2022)
- ML22179A146 - Vogtle, Units 3&4 Tier 1, Revision 10, Updated through 04/22/2022 (567 page(s), 6/15/2022)
- ML22179A150 - Vogtle, Units 3 and 4, Technical Requirements Manual, Revision 19 (60 page(s), 6/15/2022)
- ML22179A148 - Vogtle, Units 3 and 4, Technical Specifications Bases, Revision 70 (648 page(s), 6/15/2022)
- ML22179A120 - Vogtle, Units 3 & 4, Enclosure 5 List of UFSAR and Tier 1 Figures & Sections Containing Security-Related or Proprietary Information, Enclosure 6 SNC Affidavit, and Enclosure 7 Westinghouse Application for Withholding Proprietary Information & Affidavit. (17 page(s), 6/15/2022)