Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report
Accession Number: ML22144A115
Date Released: Monday, August 29, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22144A139 - Beaver Valley Power Station, Unit 2, Submittal of Revision 26 to Updated Final Safety Analysis Report (7 page(s), 5/18/2022)
- ML22144A122 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, List of Effective Pages (57 page(s), 5/18/2022)
- ML22144A120 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (326 page(s), 5/18/2022)
- ML22144A135 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 2, The Site (1335 page(s), 5/18/2022)
- ML22144A125 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1024 page(s), 5/18/2022)
- ML22144A117 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 4, Reactor (248 page(s), 5/18/2022)
- ML22144A118 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (206 page(s), 5/18/2022)
- ML22144A131 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Featres (503 page(s), 5/18/2022)
- ML22144A116 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (444 page(s), 5/18/2022)
- ML22144A133 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (152 page(s), 5/18/2022)
- ML22144A126 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (404 page(s), 5/18/2022)
- ML22144A123 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (159 page(s), 5/18/2022)
- ML22144A130 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (181 page(s), 5/18/2022)
- ML22144A136 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (150 page(s), 5/18/2022)
- ML22144A114 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (31 page(s), 5/18/2022)
- ML22144A128 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (143 page(s), 5/18/2022)
- ML22144A124 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 15, Accident Analysis (457 page(s), 5/18/2022)
- ML22144A119 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (5 page(s), 5/18/2022)
- ML22144A121 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (3 page(s), 5/18/2022)
- ML22144A129 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (4 page(s), 5/18/2022)
- ML22144A132 - Beaver Valley Power Station, Unit 2, Revision 26 to Updated Final Safety Analysis Report, Chapter 19, Managing the Effects of Component Aging (61 page(s), 5/18/2022)
- ML22144A134 - Beaver Valley Power Station, Unit 2, Rev. 99 to Licensing Requirements Manual (263 page(s), 5/18/2022)
- ML22144A127 - Beaver Valley Power Station, Unit 2, Rev. 43 to Technical Specification Bases (705 page(s), 5/18/2022)