Moab UMTRA Project, Submittal of Crescent Junction Disposal Site Evapotranspiration Cover System 90% Design Report
Accession Number: ML22096A243
Date Released: Friday, April 8, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22096A253 - Moab UMTRA Project, Submittal of Crescent Junction Disposal Site Evapotranspiration Cover System 90% Design Report (1 page(s), 4/6/2022)
- ML22096A244 - Dwyer Engineering, LLC, Crescent Junction Disposal Site Evapotranspiration Cover System 90% Design Report (871 page(s), 3/21/2022)
- ML22096A245 - Dwyer Engineering, LLC, Crescent Junction Disposal Site Evapotranspiration Cover System Technical Specifications (49 page(s), 3/21/2022)
- ML22096A246 - EnergySolutions, LLC/Jacobs, Final Design Drawings (12 page(s), 4/23/2008)
- ML22096A247 - Dwyer Engineering, LLC, Crescent Junction Disposal Site Evapotranspiration Cover System Construction Quality Assurance Plan (44 page(s), 3/21/2022)
- ML22096A249 - Dwyer Engineering, LLC, Moab CJ 90 Percent Design Gravel Mixture (37 page(s), 3/21/2022)
- ML22096A250 - Dwyer Engineering, LLC, Crescent Junction Disposal Site Evapotranspiration Cover System Post-Construction Monitoring Plan (31 page(s), 3/21/2022)
- ML22096A252 - Dwyer Engineering, LLC, Moab CJ 90 Percent Design Comments Matrix (2 page(s), 3/21/2022)