Home > NRC Library > ADAMS Public Documents
Responses to NRC request for Info in App. B to "Technical Review Report: U.S. DOE Documentation Related to Tank 12 Grouting Operations with Emphasis on Specifications, Testing, Recommendations and Placement Procedures (ML20296A550)"
Accession Number: ML22056A504
Date Released: Tuesday, March 8, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22056A505 - HTF-SKM-2014-00031 Rev. A (1 page(s), 1/27/2015)
- ML22056A506 - SRR-CWDA-2014-00102 Rev 0, Disposal of Cooling Coil Grouting Liquid Within Tank 16 (5 page(s), 11/20/2014)
- ML22056A507 - SRR-LWE-2014-00162, Rev. 0, Video Inspection Plan for Tank 12 During Tank Grout Activities (11 page(s), 2/12/2015)
- ML22056A508 - SRR-LWE-2016-00020, Revision 0, Tank 12 Grout Cracks under Riser 1 (1 page(s), 2/23/2016)
- ML22056A509 - USQ-HTF-2015-00635, Use-As-Is Disposition of Non-Conformance Report (NRC) 2015-NRC-15-WHC-0008 (13 page(s), 9/17/2015)
- ML22056A510 - USQ-HTF-2015-00686, Use-As-Is Disposition of Non-Conformance Report (NCR) 2015-NCR-15-WHC-0013 (13 page(s), 10/25/2015)
- ML22056A511 - Email from L. Romanowski to M. George dtd 02/22/2022 re: Technical Review Report: Tank 12 Grouting (2 page(s), 2/22/2022)