Home > NRC Library > ADAMS Public Documents
Draft Interim Staff Guidance - DANU-ISG-2022-01 through 2022-09, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications"
Accession Number: ML22048A520
Date Released: Thursday, June 1, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML22074A146 - Federal Register Notice - Advanced Reactor Content of Application Project, "Review of Risk-Informed, Technology Inclusive Advanced Reactor Applications - Roadmap," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B546 - Draft Interim Staff Guidance - DANU-ISG-2022-01, Advanced Reactor Content of Application Project, "Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap" (129 page(s), 5/31/2023)
- ML22074A147 - Federal Register Notice - Advanced Reactor Content of Application Project Chapter 2, "Site Information," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B541 - Draft Interim Staff Guidance - DANU-ISG-2022-02, Advanced Reactor Content of Application Project Chapter 2, "Site Information" (32 page(s), 5/31/2023)
- ML22074A148 - Federal Register Notice - Advanced Reactor Content of Application Project Chapter 9, "Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B543 - Draft Interim Staff Guidance - DANU-ISG-2022-03, Advanced Reactor Content of Application Project Chapter 9, "Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste" (17 page(s), 5/15/2023)
- ML22074A149 - Federal Register Notice - Advanced Reactor Content of Application Project Chapter 10, "Control of Occupational Dose," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B544 - Draft Interim Staff Guidance - DANU-ISG-2022-04, Advanced Reactor Content of Application Project Chapter 10, "Control of Occupational Dose" (10 page(s), 5/15/2023)
- ML22074A141 - Federal Register Notice - Advanced Reactor Content of Application Project Chapter 11, "Organization and Human-System Considerations," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B542 - Draft Interim Staff Guidance - DANU-ISG-2022-05, Advanced Reactor Content of Application Project Chapter 11, "Organization and Human-System Considerations" (22 page(s), 5/15/2023)
- ML22074A142 - Federal Register Notice - Advanced Reactor Content of Application Project Chapter 12, "Post-Construction Inspection, Testing, and Analysis Program," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B545 - Draft Interim Staff Guidance - DANU-ISG-2022-06, Advanced Reactor Content of Application Project Chapter 12, "Post-construction Inspection, Testing, and Analysis Program" (20 page(s), 5/31/2023)
- ML22074A144 - Federal Register Notice - Advanced Reactor Content of Application Project, "Risk-informed Inservice Inspection Inservice Testing," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B549 - Draft Interim Staff Guidance - DANU-ISG-2022-07, Advanced Reactor Content of Application Project, "Risk-Informed Inservice Inspection/Inservice Testing" (20 page(s), 5/31/2023)
- ML22074A145 - Federal Register Notice - Advanced Reactor Content of Application Project, "Risk-Informed Technical Specifications," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B548 - Draft Interim Staff Guidance - DANU-ISG-2022-08, Advanced Reactor Content of Application Project, "Risk-Informed Technical Specifications" (22 page(s), 5/31/2023)
- ML22074A143 - Federal Register Notice - Advanced Reactor Content of Application Project, "Risk-informed Performance-based Fire Protection Program (for Operations)," Draft Interim Staff Guidance (8 page(s), 5/22/2023)
- ML22048B547 - Draft Interim Staff Guidance- DANU-ISG-2022-09, Advanced Reactor Content of Application Project, "Risk-informed, Performance-based Fire Protection Program (for Operations)" (15 page(s), 5/15/2023)
- ML23093A099 - Regulatory Analysis on Advanced Reactor Content of Application Project Draft Interim Staff Guidance Documents (3 page(s), 5/15/2023)