Home > NRC Library > ADAMS Public Documents
Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report
Accession Number: ML21334A043
Date Released: Tuesday, November 15, 2022
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21334A020 - Beaver Valley Power Station, Unit 1, Submittal of the Updated Final Safety Analysis Report, Revision 33 (6 page(s), 11/22/2021)
- ML21334A029 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, List of Effective Pages (49 page(s), 11/22/2021)
- ML21334A026 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (189 page(s), 11/22/2021)
- ML21334A040 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 2, Site (1099 page(s), 11/22/2021)
- ML21334A031 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 3, Reactor (273 page(s), 11/22/2021)
- ML21334A023 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (138 page(s), 11/22/2021)
- ML21334A024 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 5, Containment Systems (210 page(s), 11/22/2021)
- ML21334A037 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (163 page(s), 11/22/2021)
- ML21334A022 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls (184 page(s), 11/22/2021)
- ML21334A039 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (59 page(s), 11/22/2021)
- ML21334A032 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency System (201 page(s), 11/22/2021)
- ML21334A028 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (45 page(s), 11/22/2021)
- ML21334A035 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (233 page(s), 11/22/2021)
- ML21334A041 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations (10 page(s), 11/22/2021)
- ML21334A021 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation (62 page(s), 11/22/2021)
- ML21334A033 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (529 page(s), 11/22/2021)
- ML21334A030 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 15, Technical Specifications And Bases. (3 page(s), 11/22/2021)
- ML21334A025 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Chapter 16, Managing The Effects of Component Aging (59 page(s), 11/22/2021)
- ML21334A036 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Appendix A, Quality Assurance (93 page(s), 11/22/2021)
- ML21334A027 - Beaver Valley Power Station, Unit 1, Revision 33 to Updated Final Safety Analysis Report, Appendix B, Seismic Design (159 page(s), 11/22/2021)
- ML21334A038 - Beaver Valley Power Station, Unit 1, License Requirement Manual, Revision 110 (265 page(s), 11/22/2021)
- ML21334A034 - Beaver Valley Power Station, Unit 1, Technical Specifications Bases Update Status, Revision 41. (700 page(s), 11/22/2021)