Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 3 and 4, Request for Exemption: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load
Accession Number: ML21309A545
Date Released: Tuesday, November 16, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21309A546 - Vogtle Electric Generating Plant, Units 3 and 4, Request for Exemption: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load (4 page(s), 11/5/2021)
- ML21309A547 - Vogtle Electric Generating Plant, Units 3 and 4, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load (10 page(s), 11/5/2021)