Home > NRC Library > ADAMS Public Documents
Surry, Units 1 & 2 - SUNSI Review of UFSAR Rev 52 (EPID L-2020-LRO-0076) - UFSAR 52 - Redacted Version
Accession Number: ML21208A006
Date Released: Monday, August 2, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21208A367 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (EPID L-2020-LRO-0076) - Redacted (492 page(s), 9/30/2020)
- ML21208A409 - Surry Power Station, Unit Nos. 1 and 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (EPID L-2020-LRO-0076) - Redacted (168 page(s), 9/30/2020)
- ML21208A418 - Surry Power Station, Units 1 & 2, Revision 52 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics - (EPID L-2020-LRO-0076) - Redacted (216 page(s), 9/30/2020)
- ML21208A424 - Surry Power Station, Unit Nos. 1 and 2 - ML20308A515_003 SPS UFSAR Chapter 3 - Redacted (146 page(s), 9/30/2020)
- ML21208A429 - Surry Power Station, Units 1 & 2, Revision 52 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (EPIDS L-2020-LRO-0076) - Redacted (126 page(s), 9/30/2020)
- ML21210A125 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 18, Programs and Activities That Manage the Effects of Aging (EPID L-2020-LRO-0076) - Redacted (48 page(s), 9/30/2020)
- ML21210A126 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary and Emergency Systems (EPIDS L-2020-LRO-0076) - Redacted (324 page(s), 9/30/2020)
- ML21210A127 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Frontmatter (EPID L-2020-LRO-0076) - Redacted (92 page(s), 9/30/2020)
- ML21210A128 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion (EPID L-2020-LRO-0076) - Redacted (68 page(s), 9/30/2020)
- ML21210A129 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (EPID L-2020-LRO-0076) - Redacted (38 page(s), 9/30/2020)
- ML21210A133 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations (EPID L-2020-LRO-0076) - Redacted (58 page(s), 9/30/2020)
- ML21210A134 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations(EPID L-2020-LRO-0076) - Redacted (22 page(s), 9/30/2020)
- ML21210A135 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 15, Structures and Construction (EPID L-2020-LRO-0076) - Redacted (194 page(s), 9/30/2020)
- ML21210A136 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Wastes and Radiation Protection (EPID L-2020-LRO-0076) - Redacted (116 page(s), 9/30/2020)
- ML21210A137 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 5, Containment System (EPID L-2020-LRO-0076) - Redacted (126 page(s), 9/30/2020)
- ML21210A138 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safeguards (EPID L-2020-LRO-0076) - Redacted (104 page(s), 9/30/2020)
- ML21210A139 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (EPID L-2020-LRO-0076) - Redacted (78 page(s), 9/30/2020)
- ML21210A140 - Surry Power Station, Units 1 & 2 - Revision 52 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications and Technical Requirements (EPID L-2020-LRO-0076) - Redacted (8 page(s), 9/30/2020)