Home > NRC Library > ADAMS Public Documents
Millstone Power Station, Unit 1, 2, and 3, Updates to the Final Safety Analysis Report
Accession Number: ML21201A164
Date Released: Wednesday, August 11, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21201A149 - Millstone Power Station, Unit 1, 2, and 3, Updates to the Final Safety Analysis Report (7 page(s), 6/24/2021)
- ML21201A148 - Millstone Power Station, Unit 1, Revision 16 to Defueled Safety Analysis Report, Chapter 1, Introduction and General Description of Plant; Chapter 2, Site Characteristics; Chapter 3, Facility Design and Operation; Chapter 4, Radioactive Waste.... (209 page(s), 6/24/2021)
- ML21201A154 - Millstone Power Station, Unit 1, Revision 16 to Defueled Safety Analysis Report, Drawings Incorporated by Reference - Redacted (14 page(s), 6/24/2021)
- ML21201A152 - Millstone Power Station, Unit 1, Revision 16 to Defueled Safety Analysis Report, Technical Requirements Manual (37 page(s), 6/24/2021)
- ML21201A155 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Frontmatter (93 page(s), 6/24/2021)
- ML21201A143 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 1, Introduction and Summary (139 page(s), 6/24/2021)
- ML21201A151 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 2, Site and Environment (83 page(s), 6/24/2021)
- ML21201A145 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 3, Reactor (137 page(s), 6/24/2021)
- ML21201A153 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 4, Reactor Coolant System (195 page(s), 6/24/2021)
- ML21201A150 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 5, Structures (399 page(s), 6/24/2021)
- ML21201A147 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features Systems (152 page(s), 6/24/2021)
- ML21201A144 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control (284 page(s), 6/24/2021)
- ML21201A146 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 8, Electrical Systems (166 page(s), 6/24/2021)
- ML21201A161 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (407 page(s), 6/24/2021)
- ML21201A157 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (56 page(s), 6/24/2021)
- ML21201A160 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Processing and Radiation Protection Systems (150 page(s), 6/24/2021)
- ML21201A166 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 12, Conduct of Operations (19 page(s), 6/24/2021)
- ML21201A163 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operation (103 page(s), 6/24/2021)
- ML21201A165 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 14, Safety Analysis (535 page(s), 6/24/2021)
- ML21201A162 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Chapter 15, License Renewal (54 page(s), 6/24/2021)
- ML21201A159 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference - Redacted (218 page(s), 6/24/2021)
- ML21201A158 - Millstone Power Station, Unit 2, Revision 39 to Updated Final Safety Analysis Report, Technical Requirements Manual (330 page(s), 6/24/2021)
- ML21201A185 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Frontmatter (141 page(s), 6/24/2021)
- ML21201A186 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (318 page(s), 6/24/2021)
- ML21201A192 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (574 page(s), 6/24/2021)
- ML21201A190 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 2, Tables & Appendices (859 page(s), 6/24/2021)
- ML21201A179 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems (1163 page(s), 6/24/2021)
- ML21201A174 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 4, Reactor (267 page(s), 6/24/2021)
- ML21201A181 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (209 page(s), 6/24/2021)
- ML21201A188 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (538 page(s), 6/24/2021)
- ML21201A172 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 7, Instruments and Controls (345 page(s), 6/24/2021)
- ML21201A175 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (136 page(s), 6/24/2021)
- ML21201A177 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (505 page(s), 6/24/2021)
- ML21201A180 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System (130 page(s), 6/24/2021)
- ML21201A170 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management (213 page(s), 6/24/2021)
- ML21201A176 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection (103 page(s), 6/24/2021)
- ML21201A194 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations (21 page(s), 6/24/2021)
- ML21201A184 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program (184 page(s), 6/24/2021)
- ML21201A171 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (508 page(s), 6/24/2021)
- ML21201A187 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications (3 page(s), 6/24/2021)
- ML21201A183 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance (3 page(s), 6/24/2021)
- ML21201A173 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 18, Human Factors Engineering (4 page(s), 6/24/2021)
- ML21201A191 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Chapter 19, License Renewal (53 page(s), 6/24/2021)
- ML21201A182 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Fire Protection Evaluation Report (396 page(s), 6/24/2021)
- ML21201A178 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Drawings Incorporated by Reference (185 page(s), 6/24/2021)
- ML21201A193 - Millstone Power Station, Unit 3, Revision 34 to Updated Final Safety Analysis Report, Technical Requirements Manual Index / List Of Effective Pages (279 page(s), 6/24/2021)