Indian Point Unit Nos. 1, 2, and 3 - Holtec Decommissioning International, LLC, Post Shutdown Decommissioning Activities Report and Site Specific Decommissioning Cost Estimate (EPID L-2021-LLL-0012)
Accession Number: ML21155A107
Date Released: Friday, June 4, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21155A108 - 6/4/2021 E-mail Response from R. Guzman to A. Sterdis Holtec Decommissioning International, regarding Indian Point Units 1, 2, and 3 Post-Shutdown Decommissioning Activities Report and Site Specific Decommissioning Cost Estimate (EPID L-2021-LLL-0012) (2 page(s), 6/4/2021)
- ML21155A105 - 6/4/2021 E-mail from A. Sterdis Holtec Decommissioning International regarding Indian Point Units 1, 2, and 3 Post-Shutdown Decommissioning Activities Report and Site Specific Decommissioning Cost Estimate (EPID L-2021-LLL-0012) (2 page(s), 6/4/2021)
- ML19354A698 - Post Shutdown Decommissioning Activities Report including Site-Specific Decommissioning Cost Estimate for Indian Point Nuclear Generating Units 1, 2, and 3 (127 page(s), 12/19/2019)