Home > NRC Library > ADAMS Public Documents
Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report
Accession Number: ML21102A218
Date Released: Tuesday, December 14, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21102A222 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Technical Specification Bases Changes, Technical Requirements Manual Changes, 10 CFR 50.59 Summary Report and Revised NRC Commitments Report (19 page(s), 3/30/2021)
- ML21102A232 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant & Chapter 2, Site Characteristics (Part 1) (698 page(s), 3/30/2021)
- ML21102A240 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 2, Site Characteristics (Part 2) & Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 1) (608 page(s), 3/30/2021)
- ML21102A225 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 2) (425 page(s), 3/30/2021)
- ML21102A239 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 3) (23 page(s), 3/30/2021)
- ML21102A231 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 4) (25 page(s), 3/30/2021)
- ML21102A247 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 5) (27 page(s), 3/30/2021)
- ML21102A245 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 6) (44 page(s), 3/30/2021)
- ML21102A242 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 3, Design Of Structures, Components, Equipment, And Systems (Part 7) & Chapter 4, Reactor (Part 1) (254 page(s), 3/30/2021)
- ML21102A228 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 4, Reactor (Part 2); Chapter 5, Reactor Coolant System And Connected Systems; & Chapter 6, Engineered Safety Features (Part 1) (741 page(s), 3/30/2021)
- ML21102A235 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 2) (360 page(s), 3/30/2021)
- ML21102A234 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Part 3) & Chapter 7, Instrumentation And Controls (Part 1) (607 page(s), 3/30/2021)
- ML21102A224 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation And Controls (Part 2) & Chapter 8, Electric Power (Part 1) (151 page(s), 3/30/2021)
- ML21102A241 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 2) (23 page(s), 3/30/2021)
- ML21102A243 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 8, Electric Power (Part 3); Chapter 9, Auxiliary Systems; & Chapter 10, Steam And Power Conversion System (Part 1) (1929 page(s), 3/30/2021)
- ML21102A227 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 10, Steam And Power Conversion System (Part 2); & Chapters 11, 12, 13, 14, 15, Accident Analyses (Part 1) (872 page(s), 3/30/2021)
- ML21102A229 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Part 2); & Chapters 16, 17, 18, 19; Table of Contents; Revision 23 to List of Effective Pages (735 page(s), 3/30/2021)
- ML21102A230 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Technical Requirements Manual (159 page(s), 3/30/2021)
- ML21102A248 - Vogtle Electric Generating Plant, Units 1 & 2, Revision 23 to Updated Final Safety Analysis Report, Bases for Improved Technical Specifications (797 page(s), 3/30/2021)