Home > Site Help > Search Results
Vogtle Electric Generating Plant Units 3 and 4 Revision to Request for Alternative: Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15R1)
Accession Number: ML21040A163
Date Released: Thursday, February 18, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML21040A164 - Vogtle Electric Generating Plant Units 3 and 4 Revision to Request for Alternative: Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds (VEGP 3&4-PSI/ISI-ALT-15R1) (5 page(s), 2/9/2021)
- ML21040A168 - Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Affidavit (5 page(s), 2/3/2021)
- ML21040A169 - Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Affidavit (3 page(s), 2/9/2021)
- ML21040A165 - Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section Xi Examination Coverage of Weldolet Branch Connection Welds (10 page(s), 2/9/2021)
- ML21040A167 - Vogtle Electric Generating Plant (VEGP), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections (15 page(s), 2/9/2021)