Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Submittal of Revision 28 to Updated Safety Analysis Report.
Accession Number: ML20335A110
Date Released: Monday, March 1, 2021
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20335A107 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Submittal of Revision 28 to Updated Safety Analysis Report. (2 page(s), 11/18/2020)
- ML20335A084 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 1, Introduction And General Description Of Installation. (29 page(s), 11/18/2020)
- ML20335A080 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 1, Figures. (14 page(s), 11/18/2020)
- ML20335A082 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 2, Site Characteristics. (59 page(s), 11/18/2020)
- ML20335A076 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 2, Figures. (58 page(s), 11/18/2020)
- ML20335A081 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 3, Principal Design Criteria. (74 page(s), 11/18/2020)
- ML20335A079 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 3, Figures. (2 page(s), 11/18/2020)
- ML20335A101 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 4, Installation Design. (31 page(s), 11/18/2020)
- ML20335A078 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 4, Figures. (12 page(s), 11/18/2020)
- ML20335A106 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 5, Operation Systems. (21 page(s), 11/18/2020)
- ML20335A100 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 5, Figures. (6 page(s), 11/18/2020)
- ML20335A098 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 6, Site Generated Waste Confinement And Management. (9 page(s), 11/18/2020)
- ML20335A105 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 7, Radiation Protection. (21 page(s), 11/18/2020)
- ML20335A097 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 7, Figures. (3 page(s), 11/18/2020)
- ML20335A095 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 8, Accident Analyses. (57 page(s), 11/18/2020)
- ML20335A103 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 8, Figures. (1 page(s), 11/18/2020)
- ML20335A104 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 9, Conduct Of Operations. (55 page(s), 11/18/2020)
- ML20335A102 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 10, Operating Controls and Limits. (3 page(s), 11/18/2020)
- ML20335A108 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 11, Quality Assurance. (7 page(s), 11/18/2020)
- ML20335A096 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 12, NUHOMS(R)-32P Dry Shielded Canister. (83 page(s), 11/18/2020)
- ML20335A099 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 12, Figures. (1 page(s), 11/18/2020)
- ML20335A083 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 13, NUHOMS-32P Dry Shielded Canister. (82 page(s), 11/18/2020)
- ML20335A077 - Calvert Cliffs Nuclear Power Plant Independent Spent Fuel Storage Installation - Revision 28 to Updated Safety Analysis Report, Chapter 13, Figures. (1 page(s), 11/18/2020)