SRS Tank Farm Tank 12H Grout TRR References
Accession Number: ML20279A780
Date Released: Wednesday, October 14, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20279A781 - HTF-SKM-2015-00010, Rev. B, Tank 12 Flush & Grout Fill Configuration Intact Coils. (2 page(s), 10/1/2015)
- ML20279A782 - HTF-SKM-2015-00021, Rev. 0, Tank 12 Grout Placement Plan - Sketch 1. (1 page(s), 10/6/2020)
- ML20279A783 - SDDR 13307, Supplier Deviation Disposition Request. (19 page(s), 10/28/2015)
- ML20279A784 - SRR-CWDA-2017-00015, Rev. 0, Consolidated General Closure Plan for F-Area and H-Area Waste Tank Systems. (127 page(s), 2/28/2017)
- ML20279A785 - SRR-CWDA-2020-00052, Rev. 0, Follow-Up to Tanks 12H and 16H Grouting Operations Document Request in Support of US NRC F and H Area Tank Farms Monitoring Activities. (20 page(s), 6/10/2020)
- ML20279A786 - SRR-CWDA-2020-00058, Type I Waste Tanks Dehumidification System Heating and Ventilation Ductwork. (2 page(s), 10/6/2020)
- ML20279A787 - SRR-LWE-2016-00036, Rev. 2, Tank 12 Final Configuration Report Inputs. (13 page(s), 12/6/2016)
- ML20279A788 - SRR-TCR-2016-00007, Tank 12 Grouting Liquid Spill Lessons Learned. (5 page(s), 5/9/2016)
- ML20279A789 - USQ-HTF-2015-00706, Rev. 0, Supplier Deviation Disposition Request (SDDR) Number 13307 - Deviation from Specification C-SPP-F-00055, Revision 4. (15 page(s), 10/21/2015)
- ML20279A790 - VSL-14R3330-1, Saltstone Clean Cap Grout Assessment. (123 page(s), 3/10/2014)
- ML20279A791 - WO 01337683-31, TK.12 Flush & Grout Intact Chromate Cooling Coils. (31 page(s), 11/2/2015)
- ML20279A792 - WO 01337683-31-A, Tank 12 Coil Flushing Spreadsheet. (1 page(s), 3/16/2016)
- ML20279A794 - WO 01337683-31-F, Coil Grout Spreadsheet. (1 page(s), 10/6/2020)
- ML20279A795 - WO 01337683-33, Rev. 0, Placement of Bulk Fill Grout Tank 12. (17 page(s), 4/29/2015)
- ML20279A796 - WO 01337683-33-A, Tank 12 Tremie Installation Steps. (3 page(s), 10/6/2020)
- ML20279A797 - WO 01337683-33-B, Tank 12 Cleaning/Pigging of Slickline. (3 page(s), 10/6/2020)
- ML20279A798 - WO 01337683-50, TK 12 Grout Failed Coils. (12 page(s), 8/12/2015)
- ML20279A799 - WO 01337683-51, TK 12 Closure Construction Perform Equipment. (140 page(s), 3/17/2015)
- ML20280A286 - SRS Tank Farm Grout Video Transmittal. (7 page(s), 7/6/2020)