Home > NRC Library > ADAMS Public Documents
Waterford Steam Electric Station, Unit 3 - UFSAR Review 311
Accession Number: ML20254A356
Date Released: Wednesday, November 8, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19268A150 - Waterford Steam Electric Station, Unit 3, Submittal of Revision 311 to Final Safety Analysis Report. (11 page(s), 9/11/2019)
- ML19268A141 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Table of Contents. (296 page(s), 9/11/2019)
- ML20258A071 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 01 - Introduction and General Description of Plant - Redacted (246 page(s), 9/11/2019)
- ML20258A078 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 02 - Site Characteristics (EPID L-2020-LLA-0164) - Redacted (1611 page(s), 9/11/2019)
- ML20258A086 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 03 - Design of Structures, Components, Equipment and Systems (EPID L-2020-LLA-0164) - Redacted (1111 page(s), 9/11/2019)
- ML19268A125 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 04 - Reactor. (369 page(s), 9/11/2019)
- ML20258A087 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 05 - Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted (272 page(s), 9/11/2019)
- ML20258A088 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 06 - Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted (711 page(s), 9/11/2019)
- ML19268A128 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 07 - Instrumentation and Controls. (479 page(s), 9/11/2019)
- ML19268A129 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 08 - Electric Power. (239 page(s), 9/11/2019)
- ML19268A130 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 09 - Auxiliary Systems. (577 page(s), 9/11/2019)
- ML19268A131 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 10 - Steam and Power Conversion System. (246 page(s), 9/11/2019)
- ML19268A132 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 11 - Radioactive Waste Management. (185 page(s), 9/11/2019)
- ML20258A091 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 12 - Radiation Protection (EPID L-2020-LLA-0164) - Redacted (192 page(s), 9/11/2019)
- ML19268A134 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 13 - Organizational Structure. (31 page(s), 9/11/2019)
- ML19268A135 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 14 - Initial Test Program. (157 page(s), 9/11/2019)
- ML19268A136 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 15 - Accident Analyses. (982 page(s), 9/11/2019)
- ML19268A137 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 17 - Quality Assurance. (3 page(s), 9/11/2019)
- ML19268A123 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Chapter 18 - Aging Management Programs and Activities. (70 page(s), 9/11/2019)
- ML20258A092 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted (125 page(s), 9/11/2019)
- ML19268A149 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, Instructions. (8 page(s), 9/11/2019)
- ML19268A148 - Waterford Steam Electric Station, Unit 3, Revision 311 to Final Safety Analysis Report, EC Markups July 2019. (5 page(s), 9/11/2019)