Home > NRC Library > ADAMS Public Documents
Waterford Steam Electric Station, Unit 3 - UFSAR Review 310
Accession Number: ML20254A353
Date Released: Wednesday, November 8, 2023
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML18229A168 - Waterford, Unit 3 - Re-submittal of Final Safety Analysis Report, Revision 310, figure change was inadvertently omitted from last FSAR update. (13 page(s), 7/25/2018)
- ML20255A218 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (EPID L-2020-LLA-0164) - Redacted (245 page(s), 7/25/2018)
- ML20255A219 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 2, Site Characteristics (EPID L-2020-LLA-0164) - Redacted (1611 page(s), 7/25/2018)
- ML20255A220 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment and Systems (EPID L-2020-LLA-0164) - Redacted (1112 page(s), 7/25/2018)
- ML18229A172 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 4, Reactor. (369 page(s), 7/25/2018)
- ML20255A239 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems (EPID L-2020-LLA-0164) - Redacted (271 page(s), 7/25/2018)
- ML20255A242 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features (EPID L-2020-LLA-0164) - Redacted (711 page(s), 7/25/2018)
- ML18229A175 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls. (480 page(s), 7/25/2018)
- ML18229A176 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 8, Electric Power. (237 page(s), 7/25/2018)
- ML18229A177 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems. (576 page(s), 7/25/2018)
- ML18229A178 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System. (243 page(s), 7/25/2018)
- ML18229A180 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management. (361 page(s), 7/25/2018)
- ML20255A253 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 12, Radiation Protection (EPID L-2020-LLA-0164) - Redacted (192 page(s), 7/25/2018)
- ML18229A183 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 13, Organization Structure. (31 page(s), 7/25/2018)
- ML18229A184 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 14, Initial Test Program. (157 page(s), 7/25/2018)
- ML18229A185 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 15, Accident Analyses. (982 page(s), 7/25/2018)
- ML18229A186 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Chapter 17, Quality Assurance. (3 page(s), 7/25/2018)
- ML18229A189 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, List of Effective Pages, Final. (4 page(s), 7/25/2018)
- ML18229A190 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Table of Contents. (308 page(s), 7/25/2018)
- ML20255A257 - Waterford, Unit 3, Revision 310 to Final Safety Analysis Report, Reference Drawings (EPID L-2020-LLA-0164) - Redacted (130 page(s), 7/25/2018)