Home > NRC Library > ADAMS Public Documents
Submits supplemental response to NRC Bulletin 96-003, "Potential Plugging of ECC Suction Strainers by Debris in BWRs." Amended sections delineated by rev bar in right hand margin.No new regulatory commitments contained in ltr.
Accession Number: ML20249B959
Date Released: Saturday, September 19, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20249B958 - Submits supplemental response to NRC Bulletin 96-003, "Potential Plugging of ECC Suction Strainers by Debris in BWRs." Amended sections delineated by rev bar in right hand margin.No new regulatory commitments contained in ltr. (3 page(s), 6/19/1998)
- ML20249B969 - Rev 1 to VC44.F02, "Brunswick Steam Electric Plant,Units 1 & 2,ECCS Suction Strainers Replacement Project,NRC Bulletin 96-003 Final Rept." (37 page(s), 6/11/1998)
- ML20249B975 - Rev 1 to "Summary Rept on Performance of Performance Contracting,Inc's Sure-Flow Suction Strainer w/Various Mixes of Simulated Post-LOCA Debris." (24 page(s), 9/19/1997)
- ML20249B988 - Rev 0 to WO4536-01, "Performance Contracting,Inc,ECCS Sure- Flow Strainer Data Rept." (44 page(s), 12/31/1996)
- ML20249C004 - Rev 2 to TR-ECCS-GEN-01-NP, "Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers." (83 page(s), 9/30/1997)
- ML20249C009 - Rev 1 to TR-ECCS-GEN-05-NP, "Hydrodynamic Inertial Mass Testing of ECCS Suction Strainers Suppl 1 - Free Vibration Data Analysis." (26 page(s), 9/30/1997)
- ML20249C013 - Rev 0 to TR-ECCS-GEN-011, "ECCS Suction Strainer Hydrodynamic Test Summary Rept." (47 page(s), 6/11/1998)