Home > NRC Library > ADAMS Public Documents
Fourth partial response to FOIA request for documents. Documents listed in App D,being withheld in part (ref FOIA Exemption 6).
Accession Number: ML20248L208
Date Released: Thursday, October 24, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20248L206 - Fourth partial response to FOIA request for documents. Documents listed in App D,being withheld in part (ref FOIA Exemption 6). (3 page(s), 6/3/1998)
- ML20248L978 - Informs that JR Metzger conducted independent survey of outer facility at US Nuclear Corp on 680215.All accessible surfaces inside & outside outer facility,including glass & light fixture,show less than 500 disintegrations per minute. (1 page(s), 2/15/1968)
- ML20248L939 - Partially deleted interim rept discussing 680220 & 21 visit to US Nuclear Corp in Burbank,CA for primary purpose of observing radiography of six nominal 35-40 curie plutonium- beryllium neutron sources to be shipped to Westinghouse. (7 page(s), 3/11/1968)
- ML20248L282 - Responds to request from HE Book,requesting detailed info for any special nuclear matl remaining in possession.Also included,recapitulation of receiving records taken from AEC 101 form,which part of file record. (2 page(s), 2/7/1968)
- ML20248L223 - Partially deleted ltr forwarding insp repts for licenses 4-580-3 & 7 & amends thereto on 580812-13.Items of noncompliance noted. (4 page(s), 8/26/1958)
- ML20248L946 - Submits notification that schedule arranged to start work on 680220 re radiographic exam of six plutonium-238-berrllium neutron sources.Ltr from RM Fallis to S Kinsman re decontamination efforts,encl. (57 page(s), 2/16/1968)
- ML20248L942 - Informs that JR Metzger conducted independent survey of outer facility at US Nuclear on 680215.All accessible surfaces inside & outside outer facility,including glass & light fixture,showed less than 500 disintegrations. (1 page(s), 2/15/1968)
- ML20248L271 - Inform that ltr written to assure that matls of construction used to produce Plutonium Beryllium sources for Westinghouse pursuant to order 73-Y-377762 to same MIL-S-23195 rev A specification as matl used for order 73-DY-373024-M. (4 page(s), 2/6/1968)
- ML20248L276 - Submits outline of steps company taking to make outer facility safe while radiographic work being done. (2 page(s), 2/9/1968)
- ML20248L965 - Forwards partially deleted memo rept of insp made at US Nuclear Corp in Burbank,CA on 690210 for purpose of making final survey on clausing lathe from machine shop & transfer of small lathe from outer facility to waste container. (1 page(s), 2/14/1969)
- ML20248L969 - Partially deleted memo discussing 690206 survey of disassembled machine lathe,discussion of procedures for work in outer facility,DOT communications & bioassay results for license SNM-1002,US Nuclear Corp in Burbank,CA. (6 page(s), 2/13/1998)
- ML20248L973 - Partially deleted memo discussing 690318 visit to US Nuclear Corp in Burbank,CA license SNM-1002 to perform fire safety insp of facility bldg. (8 page(s), 3/20/1969)
- ML20248L933 - Informs that several errors identified in author outline of SS materials accountability submitted on 680207.Partially deleted handwritten notes. (8 page(s), 2/8/1968)
- ML20248L256 - Partially deleted memo discussing decontamination of outer facility at US Nuclear Corp on 680205-09 & 15 to determine whether licensee could decontaminate Pu outer facility to acceptable levels of contamination. (6 page(s), 3/8/1968)
- ML20248L943 - Ack receipt of telegram dtd 680202 from RM Fallis & ltrs dtd 680205,6,7 & 9 from B Bradley re radiographic exam & subsequent shipment of six plutonium-238-berrllium neutron sources for Westinghouse. (2 page(s), 2/16/1968)
- ML20248L955 - Informs that 2 individuals involved in plutonium 238 release will be given whole body & lung count at Battelle North West on 680125.All operations under license SNM-1002 have stopped.Also encl,ltr from JO Ward to Panic dtd 680126. (2 page(s), 1/24/1968)
- ML20248L229 - Partially deleted insp rept for licenses 4-580-3 & 7 & amends thereto on 580812-13.Items of noncomplianced noted. Major areas inspected:licensee activities. (19 page(s), 8/28/1958)
- ML20248L265 - Requests permission for x-ray on six neutron sources fabricated for Westinghouse.X-Ray can be performed in outer facility & can guarantee safety of individuals doing approval X-ray. (2 page(s), 2/2/1968)
- ML20248L951 - Partially deleted compliance investigation rept for license SNM-1002 on 680128-30.Items of noncompliance noted.Major areas investigated:type A exposure to personnel & shutdown of facility from Plutonium 238 release on 680118. (34 page(s), 3/22/1968)
- ML20248L952 - Partially deleted ltr re medical findings & recommendations on plutonium 238 accident occurring at US Nuclear Corp in in Burbank,CA. (6 page(s), 1/29/1968)