NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Engineering Study on Control Room Integrity Test Requirement." Util believes requirement to demonstrate integrity of control room envelope by "in leakage" testing no longer necessary.

Accession Number: ML20248B999

Date Released: Friday, September 18, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer