NRC Logo

Home > NRC Library > ADAMS Public Documents

Part 21 rept re atmospheric dump valves.Cause of failure speculative but result of piston ring that failed to seal. Resolution to problem requires increasing pilot valve capacity & reworking of plug to enlarge pilot flow area.

Accession Number: ML20247P804

Date Released: Thursday, September 17, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer