Home > NRC Library > ADAMS Public Documents
Forwards Vols 1-17,consisting of Chapters 1-18,to "CESSAR Design Certification," for approval,per 10CFR52.
Accession Number: ML20247G537
Date Released: Friday, September 18, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20247G535 - Forwards Vols 1-17,consisting of Chapters 1-18,to "CESSAR Design Certification," for approval,per 10CFR52. (3 page(s), 3/30/1989)
- ML20247G636 - Vols 1-17,consisting of Chapters 1-18,to "CESSAR Design Certification," through Amend E. (4357 page(s), 3/30/1989)
- ML20247H316 - Chapter 9, "Auxiliary Sys," to CESSAR Sys 80+ std design. W/four oversize encls. (309 page(s), 3/30/1989)
- ML20247J059 - Chapter 18, "Human Factors Engineering," to CESSAR Sys 80+ std design. (696 page(s), 3/30/1989)
- ML20247H453 - App 15C, "Analysis Methods for Steam Line Breaks," to CESSAR Sys 80+ std design. (17 page(s), 3/30/1989)
- ML20248C380 - App 3.11A, "Environ Qualification for Structures & Components," to CESSAR Sys 80+ std design. (23 page(s), 3/30/1989)
- ML20247H470 - Chapter 16, "Tech Specs," to CESSAR Sys 80+ std design. (321 page(s), 3/30/1989)
- ML20247G983 - App 5B, "Structural Evaluation of Steam Line Break for Steam Generator Internals," to CESSAR Sys 80+ std design. (9 page(s), 3/30/1989)
- ML20247H033 - Chapter 6, "ESFs," to CESSAR Sys 80+ std design.W/one oversize encl. (738 page(s), 3/30/1989)
- ML20247H360 - App 11A, "Core Residence Times," to CESSAR Sys 80+ std design. (6 page(s), 3/30/1989)
- ML20247H417 - Chapter 15, "Accident Analyses," to CESSAR Sys 80+ std design. (597 page(s), 3/30/1989)
- ML20248C392 - App 3.11B, "Identification & Location of Mechanical & Electrical Safety-Related Sys Components," to CESSAR Sys 80+ std design. (26 page(s), 3/30/1989)
- ML20247Q145 - App 15D, "Steam Generator Tube Rupture W/Loss of Offsite Power & Single Failure," to CESSAR Sys 80+ std design. (51 page(s), 3/30/1989)
- ML20247H308 - Chapter 8, "Electric Power," to CESSAR Sys 80+ std design. (94 page(s), 3/30/1989)
- ML20247G928 - App 5A, "Overpressure Protection for C-E Sys 80 PWRs," to CESSAR Sys 80+ std design. (16 page(s), 3/30/1989)
- ML20247G868 - App 4B, "Hot Loop Flow Testing of Sys 80 Fuel & Control Element Assembly Components," to CESSAR 80+ std design. (12 page(s), 3/30/1989)
- ML20247H403 - Chapter 14, "Initial Test Program," to CESSAR Sys 80+ std design. (156 page(s), 3/30/1989)
- ML20247H478 - Chapter 17, "QA Program," to CESSAR Sys 80+ std design. (3 page(s), 3/30/1989)
- ML20247H397 - Chapter 13, "Conduct of Operators," to CESSAR Sys 80+ std design. (24 page(s), 3/30/1989)
- ML20247H443 - App 15B, "Methods for Analysis of Loss of Feedwater Inventory Events," to CESSAR Sys 80+ sys design. (72 page(s), 3/30/1989)
- ML20247H291 - Chapter 7, "Instrumentation & Controls," to CESSAR Sys 80+ std design. (461 page(s), 3/30/1989)
- ML20247G913 - Chapter 5, "RCS & Connected Sys," to CESSAR Sys 80+ std design.W/two oversize encls. (216 page(s), 3/30/1989)
- ML20247G678 - Chapter 2, "Site Envelope Characteristics," to CESSAR Sys 80+ std design. (14 page(s), 3/30/1989)
- ML20247H427 - App 15A, "Loss of Primary Coolant Flow Methodology Description," to CESSAR Sys 80+ std design. (20 page(s), 3/30/1989)
- ML20247G666 - Chapter 1, "Introduction & General Plant Description," to CESSAR Sys 80+ std design.W/one oversize encl. (125 page(s), 3/30/1989)
- ML20247Q017 - App 10A, "Emergency Feedwater Sys Reliability Analysis," to CESSAR Sys 80+ std design. (53 page(s), 3/30/1989)
- ML20247G714 - Chapter 3, "Design of Structures,Components,Equipment & Sys," to CESSAR Sys 80+ std design. (154 page(s), 3/30/1989)
- ML20247G851 - Chapter 4, "Reactor," to CESSAR Sys 80+ std design. (353 page(s), 3/30/1989)
- ML20247G989 - App 5C, "Structural Evaluation of Feedwater Line Break for Steam Generator Internals," to CESSAR Sys 80+ std design. (9 page(s), 3/30/1989)
- ML20247H336 - Chapter 10, "Steam & Power Conversion Sys," to CESSAR Sys 80+ std design.W/one oversize encl. (142 page(s), 3/30/1989)
- ML20248B002 - App 3A, "Discussion of Finite Difference Analysis for Analysis of Pipe Whip," to CESSAR Sys 80+ std design. (55 page(s), 3/30/1989)
- ML20247G862 - App 4A "Sys 80 Reactor Flow Model Test Program," to CESSAR Sys 80+ std design. (18 page(s), 3/30/1989)
- ML20247H353 - Chapter 11, "Radwaste Mgt," to CESSAR Sys 80+ std design. (72 page(s), 3/30/1989)
- ML20247Q075 - App 13A, "Sabotage Protection," to CESSAR Sys 80+ std design. (23 page(s), 3/30/1989)
- ML20247H394 - Chapter 12, "Radiation Protection," to CESSAR Sys 80+ std desing. (28 page(s), 3/30/1989)