NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards evaluation rept re BWR overfill events resulting in steam line flooding.All events included reactor depressurization followed by uncontrolled condensate or condensate booster pumps injection or both.

Accession Number: ML20245B622

Date Released: Tuesday, September 15, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer