NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Sequoyah Nuclear Plant,Unit 1,Cycle 3B Insp Steam Generator Tubing Insp Results," per Tech Spec 4.4.5.5.b.None of inspected tubes determined to be defective.

Accession Number: ML20244C534

Date Released: Monday, September 14, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer