Home > NRC Library > ADAMS Public Documents
Forwards Plant Operations Procedures 07-S-53-C11-21 & 07-S-53-C11-22 written to perform testing of Scram Valves A & B,respectively,per NRC 870731 request for addl info re util response to Generic Ltr 83-28,Item 4.5.
Accession Number: ML20235Y856
Date Released: Saturday, September 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20235Y855 - Forwards Plant Operations Procedures 07-S-53-C11-21 & 07-S-53-C11-22 written to perform testing of Scram Valves A & B,respectively,per NRC 870731 request for addl info re util response to Generic Ltr 83-28,Item 4.5. (2 page(s), 10/16/1987)
- ML20235Y895 - Rev 0 to Procedure 07-S-53-C11-21, "Loop Calibr Instruction Backup Scram Valve A Functional Test,Safety-Related." (12 page(s), 9/22/1987)
- ML20235Y914 - Rev 0 to Procedure 07-S-53-C11-22, "Loop Calibr Instruction Backup Scram Valve B Functional Test,Safety-Related." (12 page(s), 9/22/1987)