Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request re Allied Chemical UF6 cylinder facility.App A documents forwarded & available in PDR.App B documents available in PDR.
Accession Number: ML20235P132
Date Released: Wednesday, October 23, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20235P129 - Partial response to FOIA request re Allied Chemical UF6 cylinder facility.App A documents forwarded & available in PDR.App B documents available in PDR. (5 page(s), 7/15/1987)
- ML20235P459 - Forwards executive summary & insp rept from insp on 861103-07 for review.W/o insp rept. (27 page(s), 11/26/1986)
- ML20235P409 - Forwards proposed responses to questions from 860314 Synor hearing,per EDO Control 001657.Responses discussed w/LI Cobb of IE. (6 page(s), 4/23/1986)
- ML20235P239 - Insp Rept 40-3392/84-02 on 841128-30,1203-05 & 17-18 & 850117.Violations noted.Major areas inspected:radiation protection,solid radwaste mgt,environ monitoring & safety committees.Supporting documentation encl. (20 page(s), 2/21/1985)
- ML20235P172 - "UF6 Cylinder Weighing." Supporting documentation encl. (20 page(s), 12/3/1984)
- ML20235P436 - Confirms discussion w/G France re corrective actions planned for two UF6 cylinders reported to have mfg deviation. Deviation reported on 860411.Cylinders to be treated as good after receipt of revised documentation & rev to nameplates. (1 page(s), 5/13/1986)
- ML20235P396 - Requests subcommittee be kept informed of all future meetings & decisions,repts & memoranda re facility & related issues,including energy preparedness rulemaking for fuel cycle facilities & adequacy of UF6 cylinders for transport. (4 page(s), 4/15/1986)
- ML20235P258 - Discusses actions initiated by Region III at Allied Chemical Co Metropolis facility as result of UF6 cylinder rupture at Sequoyah Fuels Gore,OK facility. (2 page(s), 1/9/1986)
- ML20235P225 - Notice of violation & proposed imposition of civil penalty in amount of $5,000.Violations noted:worker in restricted area received exposure in excess of 40 MPC-hrs. (3 page(s), 2/20/1985)
- ML20235P273 - Discusses review of UF6 cylinder filling operation for 1981-1985 to determine past performance re overfilling cylinders. (9 page(s), 1/30/1986)
- ML20235P183 - Forwards Insp Rept 40-3393/84-02 on 841128-30,1203-05 & 17-18 & notice of violation & proposed imposition of civil penalty in amount of $5,000.Insp indicated several serious weaknesses in ventilation dust collector unit. (3 page(s), 2/22/1985)
- ML20235P140 - Insp Rept 40-3392/82-02 on 821026-29.No violations noted. Major areas inspected:radiation protection,radwaste mgt, safety committees,transportation & environ monitoring. (6 page(s), 11/19/1982)
- ML20235P143 - "Product Cylinder Filling Procedures." Radiological contingency plan & supporting documentation encl. (37 page(s), 12/3/1984)
- ML20235P134 - Forwards Safety Insp Rept 40-3392/82-02 on 821026-29.No noncompliance noted. (2 page(s), 11/19/1982)