Home > NRC Library > ADAMS Public Documents
Forwards proposed changes to facility fire suppression sys design,including revised sprinkler hanger design & fire suppression flushing procedures. "Dynamic Testing of Flexibility Supported Fire Protection Sys...," also encl.
Accession Number: ML20235H510
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20235H507 - Forwards proposed changes to facility fire suppression sys design,including revised sprinkler hanger design & fire suppression flushing procedures. "Dynamic Testing of Flexibility Supported Fire Protection Sys...," also encl. (19 page(s), 7/7/1987)
- ML20235H520 - Rev 1 to "Dynamic Testing of Flexibly Supported Fire Protection Sys-Vogtle Unit II." W/three oversize drawings. (643 page(s), 6/17/1987)
- ML20266J084 - "TEST SYSTEM B - AS BUILT REPRESENTING PORTION OF SYSTEM 020 AB BUILDING LEVEL B," as built.Sheet 2 of 3. (1 page(s), 4/10/1987)
- ML20266J087 - "TEST SYSTEM A - AS BUILT REPRESENTING PORTION OF SYSTEM 065 CB ELECTRICAL TUNNEL LEVEL C," as built.Sheet 1 of 3. (1 page(s), 4/8/1987)
- ML20266J089 - "TEST SYSTEM C - AS BUILT REPRESENTING PORTION OF SYSTEM 078 CB BUILDING LEVEL 2," as built.Sheet 3 of 3. (1 page(s), 4/15/1987)