Partial response to FOIA request.App D documents available in PDR.App E & F documents re MSIVs,encl & available in PDR. App F documents partially withheld (ref FOIA Exemption 6). App G documents completely wihheld (ref FOIA Exemption 5).
Accession Number: ML20235G041
Date Released: Saturday, September 5, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20235G040 - Partial response to FOIA request.App D documents available in PDR.App E & F documents re MSIVs,encl & available in PDR. App F documents partially withheld (ref FOIA Exemption 6). App G documents completely wihheld (ref FOIA Exemption 5). (7 page(s), 9/24/1987)
- ML20235G291 - Partially withheld ltr w/illegible date re concerns expressed in 861206 ltr & 861211 conversation,concerning hydraulic fluid in MSIV actuators.Insp Rept 50-410/86-65 addressed recipient concerns.Insp rept pages encl. (3 page(s), 9/24/1987)
- ML20235H217 - Provides Status Rept 9 re facility & MSIV status,reportable events,planned activities & cumulative summary of significant events. (4 page(s), 2/4/1987)
- ML20235H103 - Provides weekly status rept re facility & MSIV status, equipment problems,reportable events,planned activities & violation of Tech Specs. (3 page(s), 11/7/1986)
- ML20235H110 - Provides weekly status rept re facility & MSIV status, violation of Tech Specs,reportable events,equipment problems,planned activities,control room atmosphere & cumulative summary of significant events. (3 page(s), 11/13/1986)
- ML20235H139 - Weekly Status Rept 5 re facility & MSIV status,reportable events,planned activities & cumulative summary of significant events. (3 page(s), 12/5/1986)
- ML20235H081 - Provides Weekly Status Rept 4,re facility & MSIV status, violation of Tech Specs,reportable events & planned activities.Cumulative summary of significant events also encl. (3 page(s), 11/26/1986)
- ML20235G726 - Partially withheld ltr providing followup to 861024 & 27 telcons re adequacy of MSIV testing.Action will be taken to examine facts & circumstances.Recipient will be informed of findings. (1 page(s), 11/17/1986)
- ML20235H200 - Provides Status Rept 8 re facility & MSIV status,reportable events,followup on previous events,planned activities & cumulative summary of significant events. (4 page(s), 1/12/1987)
- ML20235G949 - Advises of closeout of Allegation RI-86-A-0143.Region finding documented in Insp Repts 50-220/86-26 & 50-410/86-65 dtd 870211.Allegation unsubstantiated. (1 page(s), 3/11/1987)
- ML20235H168 - Provides Weekly Status Rept 7 re facility & MSIV status, violations of Tech Specs,reportable events,planned activities & cumulative summary of significant events. (4 page(s), 12/24/1986)
- ML20235H123 - Provides weekly status rept re facility & MSIV status, violation of Tech Specs,reportable events,equipment problems,planned activities & cumulative summary of significant events. (3 page(s), 11/21/1986)
- ML20235H149 - Provides Weekly Status Rept 6 re facility & MSIV status, reportable events,followup on previous events,planned activities & cumulative summary of significant events. (5 page(s), 12/12/1986)
- ML20235G837 - Partially withheld,undated ltr discussing 871117 request that inspectors look into concerns re MSIV testing.Regional staff activities concluded & findings unsubstantiated. (1 page(s), 9/24/1987)
- ML20235G193 - Discusses NRC concerns re adequacy of design & operation of MSIVs at facility.Licensee final 10CFR50.55(e) rept on MSIV leakage included commitments for confirmatory local leak rate tests & full scale prototype valve test by Apr 1987. (1 page(s), 10/30/1986)
- ML20235H221 - Provides Status Rept 10 re facility & MSIV status, reportable events,planned activities & cumulative summary of significant events.Related info,including record of 860815 & 0909 telephone repts,encl. (49 page(s), 2/27/1987)
- ML20235G953 - Informs of closeout of Allegation RI-86-A-0125.Region findings documented in Insp Rept 50-410/86-56 dtd 861217. Allegation unsubstantiated.B.Cook Feb 10 memo encl. (2 page(s), 2/24/1987)
- ML20235H002 - Advises that MSIV replacement will be done under engineering guidance of S&W.No major problems w/replacement identified. (1 page(s), 1/2/1987)
- ML20235G337 - Partially withheld ltr forwarding partially withheld 861206 ltr expressing concerns re MSIVs. (5 page(s), 12/8/1986)
- ML20235H025 - "Monitoring Rept 27 on Nine Mile Point-2 Nuclear Power Plant to State of NY Dept of Public Svc," for period of Sept-Oct, 1986. (16 page(s), 10/31/1986)
- ML20235G324 - Partially withheld ltr responding to concerns expressed in 861206 ltr & 861111 telcon,re MSIV hydraulic fluid,main condenser tube installation & diesel generator fuel line flange bolting torque practices.NRC will investigate matter. (1 page(s), 9/24/1987)