Home > NRC Library > ADAMS Public Documents
NuScale DCA Revision 5 - Public
Accession Number: ML20225A071
Date Released: Friday, August 28, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20225A044 - NuScale Power, LLC Submittal of the NuScale Standard Plant Design Certification Application, Revision 5 (3 page(s), 7/29/2020)
- ML20224A478 - Part 01 - General and Financial Information - Sections 01.01 - 01.04 (Rev. 5) - Part 01 - General and Financial Information - Sections 01.01 - 01.04 (3 page(s), 7/29/2020)
- ML20224A480 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 01 - Certified Design Descriptions and Inspections, Tests, Analyses, and Acceptance Criteria - Chapters 01 - 05 (140 page(s), 7/29/2020)
- ML20224A481 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 01 - Introduction and General Description of the Plant - Sections 01.01 - 01.10 (352 page(s), 7/29/2020)
- ML20224A482 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 02 - Site Characteristics and Site Parameters - Sections 02.00 - 02.05 (25 page(s), 7/29/2020)
- ML20224A483 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.01 - 03.06 (268 page(s), 7/29/2020)
- ML20224A484 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 1 - 265 (265 page(s), 7/29/2020)
- ML20224A485 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 266 - 307 (42 page(s), 7/29/2020)
- ML20224A486 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 308 - 345 (38 page(s), 7/29/2020)
- ML20224A487 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.07 - Seismic Design - Pages 346 - 482 (137 page(s), 7/29/2020)
- ML20224A488 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Design Cat I Structures - Pages 1 - 140 (140 page(s), 7/29/2020)
- ML20224A489 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Section 03.08 - Design Cat I Structures - Pages 141 - 271 (131 page(s), 7/29/2020)
- ML20224A490 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Sections 03.09 - 03.13 (175 page(s), 7/29/2020)
- ML20224A491 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 03 - Design of Structures, Systems, Components and Equipment - Appendices 3A - 3C (309 page(s), 7/29/2020)
- ML20224A492 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 04 - Reactor - Sections 04.01 - 04.06 (202 page(s), 7/29/2020)
- ML20224A493 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 05 - Reactor Coolant System and Connecting Systems - Sections 05.01 - 05.04 (160 page(s), 7/29/2020)
- ML20224A494 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 06 - Engineered Safety Features - Sections 06.01 - 06.07 (162 page(s), 7/29/2020)
- ML20224A495 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 07 - Instrumentation and Controls - Sections 07.00 - 07.02 (304 page(s), 7/29/2020)
- ML20224A497 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 08 - Electric Power - Sections 08.01 - 08.04 (135 page(s), 7/29/2020)
- ML20224A498 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 09 - Auxiliary Systems - Section 09.01 - Appendix 9A (806 page(s), 7/29/2020)
- ML20224A499 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 10 - Steam and Power Conversion System - Sections 10.01 - 10.04 (151 page(s), 7/29/2020)
- ML20224A500 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 11 - Radioactive Waste Management - Sections 11.01 - 11.06 (167 page(s), 7/29/2020)
- ML20224A501 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 12 - Radiation Protection - Sections 12.01 - 12.05 (194 page(s), 7/29/2020)
- ML20224A502 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 13 - Conduct of Operations - Sections 13.01 - 13.07 (12 page(s), 7/29/2020)
- ML20224A503 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 14 - Initial Test Program and Inspections, Tests, Analyses, and Acceptance Criteria - Sections 14.00 - 14.03 (352 page(s), 7/29/2020)
- ML20224A504 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 15 - Transient and Accident Analyses - Sections 15.00 - 15.10 (633 page(s), 7/29/2020)
- ML20224A505 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 16 - Technical Specifications - Section 16.01 - Technical Specifications (13 page(s), 7/29/2020)
- ML20224A506 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 17 - Quality Assurance and Reliability Assurance - Sections 17.01 - 17.06 (24 page(s), 7/29/2020)
- ML20224A507 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 18 - Human Factors Engineering - Sections 18.00 - 18.12 (80 page(s), 7/29/2020)
- ML20224A508 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 19 - Probabilistic Risk Assessment and Severe Accident Evaluation - Sections 19.00 - 19.05 (424 page(s), 7/29/2020)
- ML20224A509 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 20 - Mitigation of Beyond-Design-Basis Events - Sections 20.01 - 20.02 (16 page(s), 7/29/2020)
- ML20224A510 - Part 02 - Final Safety Analysis Report (Rev. 5) - Part 02 - Tier 02 - Chapter 21 - Multi-Module Design Considerations - Sections 21.01 - 21.04 (21 page(s), 7/29/2020)
- ML20224A512 - Part 03 - Applicants Environmental Report - Standard Design Certification (Rev. 5) - Part 03 - Applicants Environmental Report - Standard Design Certification - Section 1.0 - Appendix B (133 page(s), 7/29/2020)
- ML20224A515 - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 5) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 2 - Bases - Chapters 02 - 03 (269 page(s), 7/29/2020)
- ML20224A514 - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants (Rev. 5) - Part 04 - Generic Technical Specifications - NuScale Nuclear Power Plants - Volume 1 - Specifications - Chapters 01 - 05 (154 page(s), 7/29/2020)
- ML20224A517 - Part 05 - Emergency Plans (Rev. 5) - Part 05 - Emergency Plans (3 page(s), 7/29/2020)
- ML20224A519 - Part 06 - Security Plans (Rev. 5) - Part 06 - Security Plans (3 page(s), 7/29/2020)
- ML20224A521 - Part 07 - Exemptions - Chapters 01 - 17 (Rev. 5) - Part 07 - Exemptions - Chapters 01 - 17 (102 page(s), 7/29/2020)
- ML20224A523 - Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (Rev. 5) - Part 08 - License Conditions, Inspections, Tests, Analyses and Acceptance Criteria (3 page(s), 7/29/2020)
- ML20224A525 - Part 09 - Withheld Information (Rev. 5) - Part 09 - Withheld Information (4 page(s), 7/29/2020)
- ML20224A527 - Part 10 - Quality Assurance Program Description (Rev. 5) - Part 10 - Quality Assurance Program Description (3 page(s), 7/29/2020)