NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards engineering insp repts 50-254/97-10 & 50-265/97-10 on 970609-0725 & NOV.Application of engineering design change & corrective action process appeared to be weak & good engineering practices were not always followed.

Accession Number: ML20217Q145

Date Released: Tuesday, August 18, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer