Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents.Forwards documents listed in App B in entirety.
Accession Number: ML20216F225
Date Released: Wednesday, October 23, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20216F223 - Final response to FOIA request for documents.Forwards documents listed in App B in entirety. (2 page(s), 4/13/1998)
- ML20216F718 - Forwards amend 2 to license TR-2,authorizing W to possess, but not to operate WTR.Also encl are notice of amend & hazards analysis rept. (1 page(s), 3/25/1963)
- ML20216F729 - Notice of issuance of amend 2 to license TR-2,authorizing Westinghouse to possess,but not operate retired WTR,located at Waltz Mill in Westmoreland,PA. (2 page(s), 3/25/1963)
- ML20216F735 - Discusses 670602 ltr re request for renewal of license TR-2. (2 page(s), 6/28/1967)
- ML20216F312 - Submits rept of investigation re incident at Westinghouse Testing Reactor,license TR-2,Waltz,PA. (3 page(s), 5/27/1960)
- ML20216F504 - Forwards rept re release of contaminated water to storm sewers on WTR Site.Prevention of further releases of this type are listed. (10 page(s), 7/28/1960)
- ML20216F271 - Forwards copies of Westinghouse rept WTR-49 containing description,analysis & conclusion re partial destruction of fuel element in Westinghouse Testing Reactor on 600403.Ltr, dtd 600711 also encl. (1 page(s), 7/13/1960)
- ML20216F743 - Forwards order authorizing partial dismantle of WTR to extent described in 690429 application & suppl,dtd 690505. Notice of issuance of order also encl. (1 page(s), 5/19/1969)
- ML20216F268 - Investigation rept AEC-R 5/11.No noncompliance noted.Major areas investigated:allegation re inadequate coolant flow under conditions existing & defective metallurgical bonding in fuel element. (4 page(s), 7/18/1960)
- ML20216F640 - Forwards analysis of safety operation of WTA.Authorization granted to W to transfer SF elements to pool in decontamination bldg for storage prior to shipment off site. (5 page(s), 3/2/1962)
- ML20216F519 - Procedure P-107, "Operating Procedures & Stds,Abnormal Operation Procedures." (4 page(s), 7/6/1960)
- ML20216F540 - Submits table giving suitable operating conditions which will be observed during escalation program.WTR operating procedures P-107 detailing action to be taken by reactor operating staff in event of reactivity changes encl. (3 page(s), 7/18/1960)
- ML20216F389 - Discusses initial investigation of Westinghouse Testing Reactor.In AEC opinion,CMA unloading & cleanup operations are being conducted in satisfactory manner w/no spread of contamination & no overexposure to personnel. (5 page(s), 4/15/1960)
- ML20216F758 - Notice of issuance of order authorizing W to partially dismantle WTR located near Waltz Mill,in Westmoreland,PA. (1 page(s), 5/19/1969)
- ML20216F749 - Order authorizing partial dismantling of facility.Orders that Westinghouse Electric Corp may proceed,IAW terms & conditions of application,w/partial dismantling of WTR covered by license TR-2. (3 page(s), 5/19/1969)
- ML20216F356 - Discusses 600403 radiation incident at Westinghouse Testing Reactor,Waltz Mills,PA.Further investigation indicates that incident be classified as Type A under AEC 0707-053. (2 page(s), 4/18/1960)
- ML20216F618 - Ack receipt of 610301 ltr from AR Luedecke re WTR.Committee believes that modified design,method of operation & experimental program should be reviewed. (11 page(s), 3/4/1961)
- ML20216F241 - Forwards order issued,600630,respecting operation of Westinghouse Testing Reactor. (5 page(s), 6/30/1960)
- ML20216F724 - Amend 2 to license TR-2,amending in entirety to read as listed. (5 page(s), 3/25/1963)
- ML20216F332 - Investigation rept CF-169 of incident that occurred on 600403.No noncompliance noted.Major areas investigated: radiation incident at Westinghouse Testing Reactor in Pennsylvania. (13 page(s), 5/27/1960)
- ML20216F409 - Forwards rept dealing w/incident involving release of radioactivity at WTR Site,per requirements of WTR emergency procedures. (4 page(s), 4/4/1960)