Home > NRC Library > ADAMS Public Documents
Fourth partial response to FOIA request.Forwards documents & tapes listed in Apps D & E,respectively.Documents & tapes placed in PDR.Portions of App D documents withheld (ref FOIA Exemptions 6 & 7).
Accession Number: ML20215G377
Date Released: Sunday, August 16, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20215G376 - Fourth partial response to FOIA request.Forwards documents & tapes listed in Apps D & E,respectively.Documents & tapes placed in PDR.Portions of App D documents withheld (ref FOIA Exemptions 6 & 7). (9 page(s), 6/11/1987)
- ML20215G627 - Forwards Pullman procedures to assist NRC review. (22 page(s), 3/8/1984)
- ML20215G712 - Engineering Instruction SP-52-166, "Ultrasonic Insp Procedure for Forgings,Bars,Plates,Bolting,Pipe,Tubing & Fittings - In Accordance W/ASME Code for Pumps & Valves for Nuclear Power." Related info encl. (123 page(s), 2/17/1972)
- ML20215G501 - Summary of 831219 meeting re submittal of grievance to Pullman Power Products concerning termination of S Lockert, QA inspector,on 831215.List of attendees encl. (1 page(s), 12/19/1983)
- ML20215G460 - Partiallu withheld memo re Pullman QC inspector allegations received on 831223.Alleger,S Lockert hired in Aug 1983 & terminated on 831215.Grievance filed w/Plumbers,Steam Fitters & Apprentices Union by alleger,per 10CFR21.50. (18 page(s), 12/23/1983)
- ML20215G610 - Forwards response to issues identified in Board Notification 84-014 re valve min wall thickness measurements originally performed in 1973 & 1974.From review of allegation,22 issues addressed,including issue raised in HO Hudson 840112 ltr. (12 page(s), 2/29/1984)
- ML20215G647 - Forwards Rept PAR(DCNP)-NDE-3, "Followup of Alleged Deficiencies in QA Program at Diablo Canyon Nuclear Plant," per 840320 telcon. (1 page(s), 3/20/1984)
- ML20215H012 - "Followup of Alleged Deficiencies in QA Program at Diablo Canyon Nuclear Plant." (125 page(s), 2/29/1984)
- ML20215G526 - Summary of 831222 meeting re clarification of S Lockert termination & subsequent grievance which originally presented & denied by Pullman Power Products on 831219. Attendee list encl.Partially withheld related info encl. (800 page(s), 12/22/1983)