Home > NRC Library > ADAMS Public Documents
Partial response to FOIA request re Apr 1983 allegations against S&W.Forwards App B,C & D documents.App C & D documents partially & App E document completely withheld (ref FOIA Exemption 7).Documents also available in PDR.
Accession Number: ML20214R560
Date Released: Saturday, August 15, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20214R558 - Partial response to FOIA request re Apr 1983 allegations against S&W.Forwards App B,C & D documents.App C & D documents partially & App E document completely withheld (ref FOIA Exemption 7).Documents also available in PDR. (7 page(s), 12/2/1986)
- ML20214R839 - Partially withheld memo re 830422 allegation of diesel generator sys design deficiencies,S&W coverup & incompetent S&W engineers.Ofc of Investigations will meet w/alleger on 830427. (2 page(s), 4/22/1983)
- ML20214R754 - Discusses 830422 anonymous allegation re deficiencies in emergency diesel generator sys,radiation containment sys & qualifications of contract personnel (Allegation Rept Q-1-83-012,based on Insp Rept 50-410/83-06). (3 page(s), 12/2/1983)
- ML20214R896 - Partially withheld Rept of Inquiry Q-1-83-012 re alleged deficiencies in emergency diesel generator,radiation containment sys & qualifications of contractor personnel. Region I will inspect generator design & operating details. (2 page(s), 5/3/1983)
- ML20214R801 - Informs that Allegation RI-83-A-037 re deficiencies in emergency diesel generator sys,radiation containment sys & qualification of contractor personnel,determined unfounded. No further action planned & case closed. (3 page(s), 12/19/1983)