NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 2 to "Pump & Valve Inservice Testing Plan, First 10 Yr Insp Interval," adding Tech Spec limit for ref RCIC sys pump & deleting ref suppression pool pumpback sys pumps,per encl relief requests.Fee paid.

Accession Number: ML20214N671

Date Released: Saturday, August 15, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer