Final response to FOIA request re Diablo Canyon.App S documents encl & available in PDR.App T documents totally withheld (ref FOIA Exemption 5).
Accession Number: ML20213E357
Date Released: Saturday, August 15, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20214K493 - Final response to FOIA request re Diablo Canyon.App S documents encl & available in PDR.App T documents totally withheld (ref FOIA Exemption 5). (4 page(s), 5/22/1987)
- ML20214K637 - Requests views on whether util/Bechtel actions constitute violation of NRC requirements,per Board Notificaton 83-48. (1 page(s), 7/6/1983)
- ML20214K509 - Board Notification 82-119:forwards repts re design verification program - Phase I for Diablo Canyon Unit 1. (44 page(s), 11/16/1982)
- ML20214K524 - Informs that rept re deviations from Pullman Power Products weld procedure codes & QA/QC discrepancies forwarded to B Hayes,Director of Ofc of Investigations. (1 page(s), 12/6/1983)
- ML20213E360 - Testimony before Subcommittee on Energy & Environ re plant licensing concerns. (11 page(s), 3/8/1983)
- ML20214N490 - Testimony of NJ Palladino before Committee on Interior & Insular Affairs,Subcommittee on Oversight & Investigations on 830308,re Diablo Canyon licensing issues. (11 page(s), 3/8/1983)
- ML20213E697 - Forwards input for Section 3.5 of SSER 20 re independent design verification program based on review of listed refs. Concurs w/RL Cloud Assoc that intake structure stable under Hosgri loadings. (5 page(s), 12/15/1983)
- ML20213E355 - Forwards Commission testimony before Subcommittee on Energy & Environ on 830308 re licensing concerns of plant,in response to 830202 ltr. (1 page(s), 3/1/1983)
- ML20213E645 - Responds to 830920 Commission info request re extent of sampling in Region V insp program w/respect to const activities,schedule for public comments after next SSER & addl SSER to close out remaining open items. (2 page(s), 10/26/1983)
- ML20214K757 - Forwards ltr to Chairman Palladino requesting clarification of Commission planned schedule for hearings/decisions on low power operation at facility.Requests written response by 831116. (1 page(s), 11/15/1983)
- ML20214K648 - Forwards SSER 18 re seismic design.Document presents safety evaluation & addresses issues called for by Commission 811119 memorandum & order (CLI-81-30). (1 page(s), 8/5/1983)
- ML20214K749 - Responds to 831114 ltr re Commission schedule & procedures for future licensing decisions for facility.ASLAB holding hearings on design QA in State of CA.Hearings should be completed by 831123 w/decision in Jan 1984. (2 page(s), 11/17/1983)
- ML20214K532 - Forwards prepared testimony for use by Commission re facilities hearing before Subcommittee on Energy & Environ on 830308.Testimony responds to Representative Udall 830202 ltr. (1 page(s), 2/28/1983)
- ML20214K738 - Advises that court granted temporary stay of fuel loading license to preserve status quo pending court decision on merits of Joint Intervenors 831109 emergency motion.Further decision anticipated early in wk. (1 page(s), 11/14/1983)
- ML20214K625 - Advises that during subsequent review of allegations re plant,at least one,re containment structure tilting,would if true warrant initiation of investigation.Ofc interest lies in whether util/Bechtel attempted to conceal info from NRC. (1 page(s), 4/7/1983)