NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards "Test of Integrated Control Sys at Davis-Besse Nuclear Power Station to Determine Integrated Control Sys Response When Power Lost & Subsequently Restored," on 860317,resolving NRC question re Rancho Seco Dec 1986 event.

Accession Number: ML20212M797

Date Released: Thursday, August 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer