NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards safety evaluation re util 861125 justification for continued operation concerning seismic adequacy of standby gas treatment sys & control room ventilation sys ductwork. Continued interim operation acceptable for Cycle 11.

Accession Number: ML20212L171

Date Released: Thursday, August 13, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer