Home > NRC Library > ADAMS Public Documents
Final response to FOIA request for documents.Forwards documents listed in app A being released in entirety & app B records being withheld in part (ref FOIA Exemption 6).
Accession Number: ML20212K030
Date Released: Tuesday, October 29, 2024
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20212K025 - Final response to FOIA request for documents.Forwards documents listed in app A being released in entirety & app B records being withheld in part (ref FOIA Exemption 6). (6 page(s), 9/28/1999)
- ML20212K724 - Forwards copies of certificate of calibr for model E120,s/n 6670 from 1988 to present. (6 page(s), 9/13/1990)
- ML20212K883 - Forwards documentation of employee training.Info should cover records needed. (2 page(s), 8/14/1980)
- ML20212M015 - Forwards closeout safety insp 30-14895/91-01 conducted on 910617.No violations were identified. (2 page(s), 8/14/1991)
- ML20212K114 - Application for license,authorizing isotopes listed in item 6A-6E may be contained as trace contaminants in alloys of precious metals with other metals such as lead.Metal alloy received as solid metal plugs processed. (2 page(s), 11/10/1978)
- ML20212L326 - Forwards copy of 850117 ltr from J Grasso.Without encl. (2 page(s), 2/25/1985)
- ML20212K675 - Forwards application for renewal of license 29-18345-01 & check in listed amount. (1 page(s), 2/20/1990)
- ML20212L952 - Notice of violations from insp on 900720-0917.Violations noted:since April 1988,Eberline E-120 GM survey instrument has not been calibrated quarterly. (2 page(s), 10/23/1990)
- ML20212K993 - Forwards amend 7 terminating license 29-18345-01,per 910403 ltr. (9 page(s), 8/20/1991)
- ML20212K948 - Requests termination of license 29-18345-01.Forwards final site survey.Possession will revert to landlord on 910501. (7 page(s), 4/3/1991)
- ML20212L318 - Responds to 850108 ltr with regrets in supplying addl info requested in 841116 ltr.All requested info should be received before end of month. (1 page(s), 1/14/1985)
- ML20212K405 - Forwards amend 3 to license 29-18345-01. (1 page(s), 1/21/1983)
- ML20212K719 - Insp rept 30-14895/90-01 on 900720-0917.Violations noted. Major areas inspected:instruments,equipment & devices, receipt & transfer of matls,radiation & contamination surveys. (19 page(s), 10/17/1990)
- ML20212L897 - Forwards amend 5 to license 29-18345-01.Document should be reviewed to be sure that all conditions are understood. Without encl. (2 page(s), 5/28/1985)
- ML20212K922 - Responds to request re clarification of calibr of survey instruments used by Teledyne Isotopes in quarterly surveys during 1988-89.Forwards cover ltr from 900911 rept. (9 page(s), 9/24/1990)
- ML20212K095 - Forwards application for license & check in listed amount. Platina propose to enter into joint project with Teledyne Isotopes to reprocess & refine platinum group metals. (1 page(s), 11/10/1978)
- ML20212K079 - Requests license as subsequent phase to Teledyne Isotopes license 29-00055-15 for purpose of processing & refining of precious metals. (13 page(s), 11/8/1978)
- ML20212K155 - Safety insp on 800514 of license 29-18345-01.Insp findings: no violations identified. (1 page(s), 5/14/1980)
- ML20212K201 - Informs that as subcontractor to Teledyne Isotopes license 29-00055-15,Teledyne received shipment of precious metals of single piece with dimensions of 7 grams U-235 too large for processing.Requests amend to license 29-18345-01 as listed. (2 page(s), 6/10/1980)
- ML20212L912 - Requests amend to add 10 micrograms of any special nuclear matl in any chemical or physical form to license 29-18345-01. (1 page(s), 7/6/1987)
- ML20212K714 - "Decommissioning Funding Plan for Platina Laboratories." (76 page(s), 9/30/1990)
- ML20212L900 - Forwards amend 6 to license 29-18345-01.Document should be reviewed to be sure that all conditions are understood. Without encl. (2 page(s), 8/14/1987)
- ML20212L961 - Ack receipt of 901119 ltr informing NRC of steps taken to correct violations noted in insp rept 30-14895/90-01. (2 page(s), 1/2/1991)
- ML20212L942 - Discusses insp rept 30-14895/90-01 on 900720-0917 & forwards notice of violation. (2 page(s), 10/23/1990)
- ML20212K129 - Submits listed info re application for matl license to process byproduct & special nuclear matls. (2 page(s), 1/30/1979)
- ML20212K390 - Application for amend to license 29-18345-01,authorizing addition of J Spaulding as Director of Research & Development. (4 page(s), 12/15/1982)
- ML20212L896 - Requests amend to license 29-18345-01 to change name of Platina Refining Labs to Platina Labs,Inc.Check in listed amount encl for amend fee. (1 page(s), 4/25/1985)
- ML20212K682 - Application for amend to license 29-18345-01,renewing license in entirety. (8 page(s), 3/21/1990)
- ML20212L312 - Discusses request for renewal of license 29-18345-01.Files indicate that NRC have not received response to request for addl info in order to process request.Response should be received within 30 days of ltr. (1 page(s), 1/8/1985)
- ML20212K685 - Ack receipt of application for renewal of license 29-18345-01.License will not expire until final action has been taken by this ofc. (1 page(s), 4/3/1990)
- ML20212K945 - Submits parent company guarantee & decommissioning funding plans. (14 page(s), 1/9/1991)
- ML20212L308 - Submits addl info needed re application for matl license to process byproduct & special nuclear matls. (2 page(s), 11/16/1984)
- ML20212K140 - Advises that Platina Refining Lab currently acting as sub contractor to Teledyne Isotopes in project re decontamination of precious metals.Requests amend to license 29-18345-01 as listed. (1 page(s), 10/16/1979)
- ML20212K547 - Insp rept 30-14895/88-01 on 880412.Violations noted.Major areas inspected:organization,licensee internal audits, training & instruction to employees,radiation protection procedures,matls,facilities & instruments. (10 page(s), 4/28/1988)
- ML20212M031 - Application for amend,renewing license 29-18345-01. (10 page(s), 3/26/1984)
- ML20212K708 - Forwards 2 copies of decommissioning funding plan.Upon approval of plan,ltr of credit will be obtained in specified amount in plan,per section 5.0 within 30 days. (1 page(s), 10/1/1990)
- ML20212L242 - Ack receipt of application for renewal of license 29-18345-01.License will not expire until final action has been taken by this ofc. (1 page(s), 4/3/1984)
- ML20212K508 - Safety & compliance insp on 880412 of license 29-18345-01. Insp findings:survey instrument E-120 not calibr quarterly, personnel monitoring TLD not performed quarterly & semiannual urinalyses not performed. (1 page(s), 4/12/1988)
- ML20212K900 - Discusses J Burk,R Cassidy,J Malanga & A Modola training session held 880908 to cover handling of radioactive refining matls.Forwards outline of presentations. (3 page(s), 9/20/1988)
- ML20212K185 - Insp rept 30-14895/80-01 on 800514.No violations noted.Major areas inspected:organization,internal audits,receipt & transfer of matls,effluent control,waste disposal & confirmatory measurements. (10 page(s), 6/3/1980)
- ML20212L322 - Submits listed info in response to 841116 ltr. (3 page(s), 1/17/1985)
- ML20212M022 - Insp rept 30-14895/91-01 on 910617.No violations noted. Major areas inspected:closeout insp limited to survey of facility for residual contamination prior to termination of license & release of facility for unrestricted use. (2 page(s), 8/15/1991)
- ML20212L018 - Partially deleted response to 790130 ltr,furnishing requested info. (3 page(s), 3/1/1979)
- ML20212M009 - Responds to NRC 901023 ltr re notice of violations. Corrective actions:instrument calibrated during 2nd & 3rd quarters of 1988,1st quarter of 1989 & during 1st & 3rd quarters of 1990. (4 page(s), 11/19/1990)
- ML20212K874 - Forwards copies of release for 2 discharges to sewer of potentially radioactive solutions.Also encl are results from 901206 urine sample. (5 page(s), 9/10/1990)
- ML20212K690 - Discusses submission of financial assurance plan for license 29-18345-01.Will submit plan no later than 900930. (1 page(s), 8/31/1990)
- ML20212L339 - Forwards renewal of license 29-18345-01.Advises that program must be conducted involving licensed radioactive matls per conditions of NRC license representations made in license application & NRC regulations. (2 page(s), 3/6/1985)
- ML20212K031 - FOIA request to review all available files in connection with Platina Refining Labs &/or Handy & Harmon. (11 page(s), 8/10/1999)