Home > NRC Library > ADAMS Public Documents
Forwards hand marked drawings for PDR provided by S&L during 970813 meeting.Addl copies of drawings are being forwarded directly to local PDR near plant at Waterford Public Library,Waterford,CT.W/50 oversize drawings.
Accession Number: ML20212C228
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20212C223 - Forwards hand marked drawings for PDR provided by S&L during 970813 meeting.Addl copies of drawings are being forwarded directly to local PDR near plant at Waterford Public Library,Waterford,CT.W/50 oversize drawings. (1 page(s), 8/27/1997)
- ML20266B589 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL EXHAUST COMBUSTION AIR & CRANKCASE VACUUM SYSTEM.Sheet 5 of 5. (1 page(s), 10/5/1996)
- ML20266B592 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY GENERATOR FUEL OIL SYSTEM. Sheet 1 of 1. (1 page(s), 5/13/1997)
- ML20266B558 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V MCC ONE LINE DIAG ROD CONTROL AREA.Sheet 2. (1 page(s), 4/7/1997)
- ML20266B604 - MILLSTONE NUCLEAR POWER STATION UNIT 3 125V DC ONE LINE DIAGRAM BATTERIES 301B 1 & 301B 2. (1 page(s), 5/8/1997)
- ML20266B541 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V ONE LINE DIAGRAM 3EJS US 1A & 3EJS US 1B. (1 page(s), 1/25/1989)
- ML20266B611 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V DISTRIBUTION PNL ONE LINE DIAG EMERGENCY DIESEL GENERATOR 3EGS PNL1A 3EGS PNL1B. (1 page(s), 4/21/1997)
- ML20266B561 - MILLSTONE NUCLEAR POWER STATION UNIT 3 120V MISC AC ONE LINE DIAGRAM.Sheet 3. (1 page(s), 1/31/1997)
- ML20266B584 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR B LUB OIL & COOLING WATER.sheet 3 of 5. (1 page(s), 4/23/1997)
- ML20266B599 - MILLSTONE NUCLEAR POWER STATION UNIT 3 125V DC ONE LINE DIAGRAM BATTERIES 301A 1 & 301A 2. (1 page(s), 5/8/1997)
- ML20266B572 - MILLSTONE NUCLEAR POWER STATION UNIT 3.Rest of title illegible. (1 page(s), 7/31/1996)
- ML20266B594 - MILLSTONE NUCLEAR POWER STATION UNIT 3 4.16KV ONE LINE DIAGRAM BUS 34C 3ENS SWG A 0.Sheet 2. (1 page(s), 3/10/1987)
- ML20266B553 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V MCC ONE LINE DIAG DSL ENCL & AUX BLR A. (1 page(s), 4/7/1997)
- ML20266B545 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V ONE LINE DIAGRAM 3EJS US3A & 3EJS US 3B. (1 page(s), 3/19/1987)
- ML20266B531 - MILLSTONE NUCLEAR POWER STATION UNIT 3 4 16KV ONE LINE DIAGRAM BUS 34D 3ENS SWG 8 P.Sheet 1. (1 page(s), 5/23/1997)
- ML20266B513 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION.Sheet 5 of 6. (1 page(s), 2/11/1997)
- ML20266B505 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION.Sheet 3 of 6. (1 page(s), 2/11/1997)
- ML20266B566 - MILLSTONE NUCLEAR POWER STATION UNIT 3 120V MISC AC ONE LINE DIAGRAM.Sheet 8. (1 page(s), 1/31/1997)
- ML20266B516 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM RADIOACTIVE GASEOUS WASTE.Sheet 2 of 2. (1 page(s), 10/4/1996)
- ML20266B569 - MILLSTONE NUCLEAR POWER STATION UNIT 3 120V MISC AC ONE LINE DIAGRAM.Sheet 10. (1 page(s), 1/3/1997)
- ML20266B497 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION.Sheet 1 of 6. (1 page(s), 5/3/1997)
- ML20266B492 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM TURBINE PLANT VENTILATION.Sheet 3 of 3. (1 page(s), 1/21/1997)
- ML20266B576 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR A LUBE OIL & COOLING WATER.Sheet 1 of 5. (1 page(s), 6/25/1997)
- ML20266B586 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR B STARTING AIR SYSTEM.Sheet 4 of 5. (1 page(s), 4/10/1997)
- ML20266B500 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION.Sheet 2 of 6. (1 page(s), 8/27/1997)
- ML20266B580 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM EMERGENCY DIESEL GENERATOR A STARTING AIR SYSTEM.Sheet 2 of 5. (1 page(s), 4/10/1997)
- ML20266B549 - MILLSTONE NUCLEAR POWER STATION UNIT 3 480V MCC ONE LINE DIAG AUXILIARY BLDG.Sheet 3. (1 page(s), 4/7/1997)
- ML20266B509 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM REACTOR PLANT VENTILATION.Sheet 4 of 6. (1 page(s), 2/11/1997)
- ML20266B522 - MILLSTONE NUCLEAR POWER STATION UNIT 3 PIPING & INSTRUMENTATION DIAGRAM FIRE PROTECTION.Sheet 3 of 4. (1 page(s), 2/11/1997)
- ML20266B536 - MILLSTONE NUCLEAR POWER STATION UNIT 3 4 16KV ONE LINE DIAGRAM BUS 34D 3ENS SWG 8 P.Sheet 2. (1 page(s), 8/27/1997)
- ML20266B526 - MILLSTONE NUCLEAR POWER STATION UNIT 3 4 16KV ONE LINE DIAGRAM BUS 34C 3ENS SWG A 0.Sheet 1. (1 page(s), 5/23/1997)