Home > NRC Library > ADAMS Public Documents
Submits nonradiological NPDES permit violation repts & rept of losses for Nov 1985 - Apr 1986,per Section 3.2 of App B to environ protection plan.
Accession Number: ML20210V458
Date Released: Wednesday, August 12, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210V451 - Submits nonradiological NPDES permit violation repts & rept of losses for Nov 1985 - Apr 1986,per Section 3.2 of App B to environ protection plan. (2 page(s), 5/30/1986)
- ML20210V482 - NPDES noncompliance notification:on 860414,oily wastewater treatment sys bypassed.Condensate pump P-2A developed packing leak & flooded pit floor.Condensate pump P-2A taken out of svc for repair. (2 page(s), 4/22/1986)
- ML20210V499 - Corrected NPDES noncompliance notification:on 860303,daily max oil & grease limit exceeded for turbine sump oil separator discharge.Addl readings made to assess sys performance & several readings also exceeded. (1 page(s), 4/15/1986)
- ML20210V527 - NPDES noncompliance notification:on 860303-10,daily max limit 20 mg/L exceeded.Turbine sump pit filled w/oil from leaking seal on turbine 4 bearing oil lift pump.Leak on pump secured.Accumulated oil pumped into oil hold tank. (2 page(s), 3/11/1986)
- ML20210V535 - NPDES noncompliance notification:on 860331,monthly average limit 15 mg/L oil/grease exceeded.Turbine sump pit filled w/oil from leaking seal on turbine 4 bearing oil lift pump. Leak on pump secured & turbine sump pumped to oil hold tank. (2 page(s), 4/10/1986)
- ML20210V540 - NPDES noncompliance notification:on 860323,daily max limit 20 mg/L oil & grease exceeded.Caused by failure of oil removal sys to remove oil from process stream.Sys engineer in process of evaluation. (2 page(s), 4/2/1986)
- ML20210V556 - NPDES noncompliance notification:on 860324,oily waste treatment sys bypassed.Normal pathway from turbine sump to M-18 emergency bypassed because turbine sump pumps P-45A & B inoperable.Turbine sump pumps P-45A & B being repaired. (2 page(s), 3/26/1986)
- ML20210V565 - NPDES noncompliance notification:on 860314,fuel oil spill of 100 gallons number 2 fuel oil.Caused by tank T-926 overfilled by vendor.Contaminated soil removed & disposed of in Orchard Hills Landfill & replaced w/fresh sand. (2 page(s), 3/24/1986)
- ML20211A945 - NPDES noncompliance notification:on 860303,daily max limit 20 mg/L exceeded.Turbine sump pit filled w/oil from leaking seal on turbine 4 bearing oil lift pump.Leak on pump secured.Turbine sump pumped to oil hold tank. (2 page(s), 3/11/1986)
- ML20211A970 - NPDES noncompliance notification:on 860207,PH daily max limitation of 9.0 for mixing basin discharge.Neutralizer tank drain valve left open following neutralizer tank release.Drain valve closed.Procedures reevaluated. (2 page(s), 2/12/1986)
- ML20211B000 - NPDES noncompliance notification:on 851201,pH not monitored. Technician unaware of required sampling.Technicians reminded of sampling requirement when sample pump out of svc. (2 page(s), 1/14/1986)