Responds to FOIA request for initial (Cycle 1) startup test repts & suppls for seven plants.Forwards App A documents. App A documents also available in PDR.App B documents previously made available in PDR.
Accession Number: ML20210T454
Date Released: Tuesday, August 11, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210T449 - Responds to FOIA request for initial (Cycle 1) startup test repts & suppls for seven plants.Forwards App A documents. App A documents also available in PDR.App B documents previously made available in PDR. (3 page(s), 5/21/1986)
- ML20210T464 - Forwards summary of startup test rept,per telcon agreement. Final startup test rept will be submitted on or before 760826,90 days following 760526 completion date of startup test program. (4 page(s), 7/1/1976)
- ML20210T500 - Startup rept. (112 page(s), 5/12/1977)
- ML20210T457 - "BG&E Calvert Cliffs Nuclear Power Plant Unit 1 Startup Test Rept." (167 page(s), 8/29/1975)
- ML20210T493 - Forwards startup rept per requirements of Tech Spec 6.9.1. Spec requires submittal of startup rept within 90 days following completion of startup test program.Startup test program completed on 770215. (1 page(s), 5/12/1977)
- ML20210T478 - Forwards "Salem Generating Station Unit 1 Startup Test Rept," per requirements of Tech Spec,Section 7.9.1. (1 page(s), 9/29/1977)
- ML20210T470 - Forwards analysis of rejected control element assembly test for inclusion in "Millstone Unit 2 Startup Test Rept." (15 page(s), 10/25/1976)
- ML20210T484 - "Salem Generating Station Unit 1 Startup Test Rept." (305 page(s), 9/29/1977)