Millstone Power Station, Unit No. 3 - June 29, 2020, Pre-Submittal Meeting Re: Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2020-LRM-0050)
Accession Number: ML20210M424
Date Released: Friday, August 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20210M423 - 06/29/2020 Summary of June 29, 2020, Pre-Submittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. Re: Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2020-LRM-0050) (7 page(s), 8/5/2020)
- ML20176A276 - Millstone Power Station, Unit 3 - Presentation Material for 6/29/20 Pre-Submittal Meeting re: Proposed License Amendment Request for Measurement Uncertainty Recapture Power Uprate (EPID L-2020-LRM-0050). (12 page(s), 6/29/2020)
- ML20168A527 - 06/29/2020 Presubmittal Teleconference with Dominion Energy Nuclear Connecticut, Inc. Re: Proposed License Amendment Request for Millstone Power Station, Unit No. 3, Re: Measurement Uncertainty Recapture Power Uprate (4 page(s), 6/16/2020)